ANALYSIS OF THE MINSK STORM COLLECTOR «DRAJNIA» OPERATION
The paper presents results of natural and numerical researches on operation of the underground ferroconcrete pipeline of a storm collector. Conclusions are drawn on the reasons of pipeline transition in a limiting state.
Main Authors: | A. I. Arastovich, D. A. Arastovich |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Belarusian National Technical University
2011-06-01
|
Series: | Nauka i Tehnika |
Online Access: | https://sat.bntu.by/jour/article/view/406 |
Similar Items
-
Determination of flood water zones caused by storm water using the example of Minsk (Belarus)
by: V. Korneev, et al.
Published: (2018-06-01) -
EPIDEMIOLOGIC RESEARCH ON EPILEPSY IN MINSK
by: T. V. Dokukina, et al.
Published: (2015-03-01) -
STUDY OF THE INCIDENCE AND PREVALENCE OF EPILEPSY IN MINSK
by: T. V. Dokukina, et al.
Published: (2016-05-01) -
Technological and Regime Solutions of Higher Operational Efficiency of Minsk Thermal Power Station No. 3 (TPS-3)
by: A. D. Kachan, et al.
Published: (2003-10-01) -
Questions of the legal nature of the Minsk agreements (international legal analysis)
by: V. V. Markov, et al.
Published: (2020-12-01)