Dynamic control of working slope shape and optimization of advance speed in seasonally stripped open-pit coal mine
Due to the discontinuity of the stripping project in seasonal stripping open-pit coal mines, the untimely advance distance of the working slope is huge. In order to reduce the advance stripping and save the stripping distance, research was carried out on dynamic control of the shape of the working s...
Main Authors: | Guangwei LIU, Yunlong HUANG, Bo CAO, Yong YAO |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Department of Coal Science and Technology
2023-10-01
|
Series: | Meitan kexue jishu |
Subjects: | |
Online Access: | http://www.mtkxjs.com.cn/article/doi/10.13199/j.cnki.cst.2023-0621 |
Similar Items
-
Optimization of working slope configuration in seasonal operations of cold regions open-pit mine
by: Guangwei Liu, et al.
Published: (2024-01-01) -
Parameter control method of working slope passing fault in open-pit coal mine
by: Guangwei LIU, et al.
Published: (2023-04-01) -
REDUCTION OF SEISMIC EFFECTS FROM BLASTING IN OPEN PIT COAL-MINES BANOVIĆI
by: Josip Krsnik, et al.
Published: (1989-12-01) -
The impact of haulroad geometric parameters on open pit mine strip ratio
by: Douglas Alexandre Gonçalves Alegre, et al. -
Perkiraan Biaya Operasi dengan Mempertimbangkan Kondisi Kontingensi di Sistem Jawa Bali 500 KV
by: Rachmad Nur Priyanto, et al.
Published: (2013-03-01)