Latvian Electric Vehicle Fast Charging Infrastructure: Results of the First Year of Operation

This article presents preliminary analysis of the Latvian national EV fast - charging network after the first year of operation. The first phase of Latvian national EV fast-charging network was launched in 2018 with 70 charging stations on the TEN-T roads and in the largest towns and cities. The art...

Full description

Bibliographic Details
Main Authors: Rubenis Aivars, Laizans Aigars, Zvirbule Andra
Format: Article
Language:English
Published: Sciendo 2019-11-01
Series:Environmental and Climate Technologies
Subjects:
Online Access:https://doi.org/10.2478/rtuect-2019-0051
_version_ 1818666083291234304
author Rubenis Aivars
Laizans Aigars
Zvirbule Andra
author_facet Rubenis Aivars
Laizans Aigars
Zvirbule Andra
author_sort Rubenis Aivars
collection DOAJ
description This article presents preliminary analysis of the Latvian national EV fast - charging network after the first year of operation. The first phase of Latvian national EV fast-charging network was launched in 2018 with 70 charging stations on the TEN-T roads and in the largest towns and cities. The article looks at the initial results, both looking at the total capacity utilization for individual charging stations, determining the hourly charging distribution; and to the utilization of the network as a whole. The results present that there is a very large dispersion of the data, most of the charging events happening in a few charging stations in and around the capital of Latvia. However, there have been charging events in all charging stations, even in the most remote ones. Even more skewed distribution was observed analyzing the charging habits of the EV users, with 10 % of users accounting for more than half of the charging events. This should be taken into account when considering applying the results for the future, expecting larger number of electric vehicles in Latvia.
first_indexed 2024-12-17T05:58:53Z
format Article
id doaj.art-a043da54fd5646c19663c13d0a5a89a8
institution Directory Open Access Journal
issn 2255-8837
language English
last_indexed 2024-12-17T05:58:53Z
publishDate 2019-11-01
publisher Sciendo
record_format Article
series Environmental and Climate Technologies
spelling doaj.art-a043da54fd5646c19663c13d0a5a89a82022-12-21T22:00:56ZengSciendoEnvironmental and Climate Technologies2255-88372019-11-0123292110.2478/rtuect-2019-0051rtuect-2019-0051Latvian Electric Vehicle Fast Charging Infrastructure: Results of the First Year of OperationRubenis Aivars0Laizans Aigars1Zvirbule Andra2Ivory Group, Skolas iela 15-7, Ikskile, LV-5001, LatviaLatvia University of Life Sciences and Technologies, Liela 1, Jelgava, LV-3001, LatviaLatvia University of Life Sciences and Technologies, Liela 1, Jelgava, LV-3001, LatviaThis article presents preliminary analysis of the Latvian national EV fast - charging network after the first year of operation. The first phase of Latvian national EV fast-charging network was launched in 2018 with 70 charging stations on the TEN-T roads and in the largest towns and cities. The article looks at the initial results, both looking at the total capacity utilization for individual charging stations, determining the hourly charging distribution; and to the utilization of the network as a whole. The results present that there is a very large dispersion of the data, most of the charging events happening in a few charging stations in and around the capital of Latvia. However, there have been charging events in all charging stations, even in the most remote ones. Even more skewed distribution was observed analyzing the charging habits of the EV users, with 10 % of users accounting for more than half of the charging events. This should be taken into account when considering applying the results for the future, expecting larger number of electric vehicles in Latvia.https://doi.org/10.2478/rtuect-2019-0051electric vehiclesev charging infrastructureev charging statistics
spellingShingle Rubenis Aivars
Laizans Aigars
Zvirbule Andra
Latvian Electric Vehicle Fast Charging Infrastructure: Results of the First Year of Operation
Environmental and Climate Technologies
electric vehicles
ev charging infrastructure
ev charging statistics
title Latvian Electric Vehicle Fast Charging Infrastructure: Results of the First Year of Operation
title_full Latvian Electric Vehicle Fast Charging Infrastructure: Results of the First Year of Operation
title_fullStr Latvian Electric Vehicle Fast Charging Infrastructure: Results of the First Year of Operation
title_full_unstemmed Latvian Electric Vehicle Fast Charging Infrastructure: Results of the First Year of Operation
title_short Latvian Electric Vehicle Fast Charging Infrastructure: Results of the First Year of Operation
title_sort latvian electric vehicle fast charging infrastructure results of the first year of operation
topic electric vehicles
ev charging infrastructure
ev charging statistics
url https://doi.org/10.2478/rtuect-2019-0051
work_keys_str_mv AT rubenisaivars latvianelectricvehiclefastcharginginfrastructureresultsofthefirstyearofoperation
AT laizansaigars latvianelectricvehiclefastcharginginfrastructureresultsofthefirstyearofoperation
AT zvirbuleandra latvianelectricvehiclefastcharginginfrastructureresultsofthefirstyearofoperation