Grain-size distribution of starting sample of size class -3.35 mm: Reliability factor of the Bond work index of grindability
The investigation of the Bond' work index of grindability of low-grade and high-grade copper ore from the Copper Mine Bor has given two, for the theory and practice of comminution processes, significant results. The first confirms the previous theoretical and practical experiences on these raw...
Main Authors: | Stanojlović Rodoljub, Sokolović Jovica, Stančev Nikola |
---|---|
Format: | Article |
Language: | English |
Published: |
Mining and Metallurgy Institute, Bor
2013-01-01
|
Series: | Mining and Metallurgy Engineering Bor |
Subjects: | |
Online Access: | https://scindeks-clanci.ceon.rs/data/pdf/2334-8836/2013/1451-01621301151S.pdf |
Similar Items
-
Dependence of the Bond work index of grindability on grain-size distribution of the starting sample of size class -3.35mm
by: Stanojlović Rodoljub, et al.
Published: (2013-01-01) -
A study of flotation kinetics of the hydrocyclone overflow and underflow in the processing of high-grade copper ore
by: Stanojlović Rodoljub, et al.
Published: (2013-01-01) -
Influence of Preheating on the Grindability of Mono/Poli Mineral Ores
by: sherein A rizk
Published: (2023-05-01) -
Analysis of the industrial results of the rough flotation process of copper ore in Majdanpek Copper Mine
by: Sokolović Jovica M., et al.
Published: (2020-01-01) -
Technological requirements of the new copper smelter of RTB Bor: A great challenge for the mining profession and science
by: Stanojlović Rodoljub, et al.
Published: (2014-01-01)