Challenges in Construction of Secant Bored Piles in Sandy Soil and Within a Railway Protection Zone

Abstract The continuing growth of population density in urban areas around the world has placed greater emphasis on the utilisation and development of underground space to meet the increasing demands of the city. Due to limited land space available in downtown areas, many cities in the world are als...

Full description

Bibliographic Details
Main Authors: Nancy Mittal, Yew Chai Ho Arthur, Sze Beng Tay Edwin
Format: Article
Language:English
Published: SpringerOpen 2020-02-01
Series:Urban Rail Transit
Subjects:
Online Access:https://doi.org/10.1007/s40864-019-00123-1
_version_ 1819179682059255808
author Nancy Mittal
Yew Chai Ho Arthur
Sze Beng Tay Edwin
author_facet Nancy Mittal
Yew Chai Ho Arthur
Sze Beng Tay Edwin
author_sort Nancy Mittal
collection DOAJ
description Abstract The continuing growth of population density in urban areas around the world has placed greater emphasis on the utilisation and development of underground space to meet the increasing demands of the city. Due to limited land space available in downtown areas, many cities in the world are also embarking on integration of major construction projects of metro infrastructure, commercial developments and residential estates, etc., to meet the growing demand of infrastructure In land-scarce Singapore, the development of a comprehensive and well-integrated public transport network is important to achieve a people-centric, world-class transport system. To enhance the connectivity of a rail network, interchange stations and underground linkways are constructed to connect the various lines so that transfers between mass rapid transit (MRT) lines can be seamless. Hence, it is becoming more challenging to construct a new MRT line in the vicinity of existing MRT lines without impacting the operations of existing MRT lines. The prime aim of this study is to present the ways to overcome the challenges in construction of secant bored piles (SBPs) above the existing underground MRT linkway (15 m below ground) and adjacent to the existing underground MRT East West Line station. The paper presents four different techniques applied to construct the SBP wall in the sandy soil since the conventional method of construction was not applicable to the site condition. The new techniques were successful as the SBP wall was constructed while keeping the vibrations and movement to the existing MRT structures within the allowable limits. From this venture, it can be concluded that it is possible to install SBPs in sandy soils without any significant impact on adjacent structures and construction timeline. The experience gained from this endeavour will be invaluable and can serve as lessons learnt for SBP works in the densely populated area and in the vicinity of existing sensitive structures which is increasingly becoming unavoidable.
first_indexed 2024-12-22T22:02:19Z
format Article
id doaj.art-a0568e0278434d8f8da9a0c0f4b6ccd8
institution Directory Open Access Journal
issn 2199-6687
2199-6679
language English
last_indexed 2024-12-22T22:02:19Z
publishDate 2020-02-01
publisher SpringerOpen
record_format Article
series Urban Rail Transit
spelling doaj.art-a0568e0278434d8f8da9a0c0f4b6ccd82022-12-21T18:11:04ZengSpringerOpenUrban Rail Transit2199-66872199-66792020-02-0162859210.1007/s40864-019-00123-1Challenges in Construction of Secant Bored Piles in Sandy Soil and Within a Railway Protection ZoneNancy Mittal0Yew Chai Ho Arthur1Sze Beng Tay Edwin2Land Transport AuthorityLand Transport AuthorityLand Transport AuthorityAbstract The continuing growth of population density in urban areas around the world has placed greater emphasis on the utilisation and development of underground space to meet the increasing demands of the city. Due to limited land space available in downtown areas, many cities in the world are also embarking on integration of major construction projects of metro infrastructure, commercial developments and residential estates, etc., to meet the growing demand of infrastructure In land-scarce Singapore, the development of a comprehensive and well-integrated public transport network is important to achieve a people-centric, world-class transport system. To enhance the connectivity of a rail network, interchange stations and underground linkways are constructed to connect the various lines so that transfers between mass rapid transit (MRT) lines can be seamless. Hence, it is becoming more challenging to construct a new MRT line in the vicinity of existing MRT lines without impacting the operations of existing MRT lines. The prime aim of this study is to present the ways to overcome the challenges in construction of secant bored piles (SBPs) above the existing underground MRT linkway (15 m below ground) and adjacent to the existing underground MRT East West Line station. The paper presents four different techniques applied to construct the SBP wall in the sandy soil since the conventional method of construction was not applicable to the site condition. The new techniques were successful as the SBP wall was constructed while keeping the vibrations and movement to the existing MRT structures within the allowable limits. From this venture, it can be concluded that it is possible to install SBPs in sandy soils without any significant impact on adjacent structures and construction timeline. The experience gained from this endeavour will be invaluable and can serve as lessons learnt for SBP works in the densely populated area and in the vicinity of existing sensitive structures which is increasingly becoming unavoidable.https://doi.org/10.1007/s40864-019-00123-1Secant bored pileRetaining wallSandy soil
spellingShingle Nancy Mittal
Yew Chai Ho Arthur
Sze Beng Tay Edwin
Challenges in Construction of Secant Bored Piles in Sandy Soil and Within a Railway Protection Zone
Urban Rail Transit
Secant bored pile
Retaining wall
Sandy soil
title Challenges in Construction of Secant Bored Piles in Sandy Soil and Within a Railway Protection Zone
title_full Challenges in Construction of Secant Bored Piles in Sandy Soil and Within a Railway Protection Zone
title_fullStr Challenges in Construction of Secant Bored Piles in Sandy Soil and Within a Railway Protection Zone
title_full_unstemmed Challenges in Construction of Secant Bored Piles in Sandy Soil and Within a Railway Protection Zone
title_short Challenges in Construction of Secant Bored Piles in Sandy Soil and Within a Railway Protection Zone
title_sort challenges in construction of secant bored piles in sandy soil and within a railway protection zone
topic Secant bored pile
Retaining wall
Sandy soil
url https://doi.org/10.1007/s40864-019-00123-1
work_keys_str_mv AT nancymittal challengesinconstructionofsecantboredpilesinsandysoilandwithinarailwayprotectionzone
AT yewchaihoarthur challengesinconstructionofsecantboredpilesinsandysoilandwithinarailwayprotectionzone
AT szebengtayedwin challengesinconstructionofsecantboredpilesinsandysoilandwithinarailwayprotectionzone