More effective heuristics for a two-machine no-wait flowshop to minimize maximum lateness
We address a manufacturing environment with the no-wait constraint which is common in industries such as metal, plastic, and semiconductor. Setup times are modelled as uncertain with the objective of minimizing maximum lateness which is an important performance measure for customer satisfac...
Main Authors: | Harun Aydilek, Asiye Aydilek, Muberra Allahverdi, Ali Allahverdi |
---|---|
Format: | Article |
Language: | English |
Published: |
Growing Science
2022-01-01
|
Series: | International Journal of Industrial Engineering Computations |
Online Access: | http://www.growingscience.com/ijiec/Vol13/IJIEC_2022_18.pdf |
Similar Items
-
Heuristics and metaheuristics to minimize makespan for flowshop with peak power consumption constraints
by: Yuan-Zhen Li, et al.
Published: (2023-01-01) -
Heuristic algorithms for two-machine re-entrant flowshop scheduling problem with jobs of two classes
by: BongJoo JEONG, et al.
Published: (2017-12-01) -
No-wait hybrid flowshop scheduling: models and solotion algorithms
by: Bahman Naderi
Published: (2016-12-01) -
Bottleneck-based heuristic for permutation flowshop scheduling
by: Isa, Noor Amira
Published: (2017) -
Two NEH Heuristic Improvements for Flowshop Scheduling Problem with Makespan Criterion
by: Christophe Sauvey, et al.
Published: (2020-04-01)