LNG Carrier Main Steam Turbine Reliability in the Exploatation Period of Time
In this paper the LNG carrier with steam turbine propulsion plant maintenance records has been analysed. Actual observed data from the ship, built in 2001, are from ship maintenance history data from September 2002 until August 2010. During the analysed period, main propulsion turbine had one major...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Gdynia Maritime University
2020-03-01
|
Series: | TransNav: International Journal on Marine Navigation and Safety of Sea Transportation |
Subjects: | |
Online Access: | http://www.transnav.eu/files/LNG Carrier Main Steam Turbine Reliability in the Exploatation Period of Time,973.pdf |
_version_ | 1818416524593987584 |
---|---|
author | Igor Poljak Josip Orovic Vlatko Knezevic Vedran Mrzljak |
author_facet | Igor Poljak Josip Orovic Vlatko Knezevic Vedran Mrzljak |
author_sort | Igor Poljak |
collection | DOAJ |
description | In this paper the LNG carrier with steam turbine propulsion plant maintenance records has been analysed. Actual observed data from the ship, built in 2001, are from ship maintenance history data from September 2002 until August 2010. During the analysed period, main propulsion turbine had one major failure and several minor failures. The ship had three dry docks and one was prolonged due to increased requirements for cargo transport. Total running hours of the main propulsion turbine in the observed period of time were 63204 hours. The list of failures and influence of each mentioned failure of main turbine propulsion machinery is discussed and analysed in respect to the propulsion autonomy of the vessel. |
first_indexed | 2024-12-14T11:52:16Z |
format | Article |
id | doaj.art-a1bda03703614649921497ded769a4c5 |
institution | Directory Open Access Journal |
issn | 2083-6473 2083-6481 |
language | English |
last_indexed | 2024-12-14T11:52:16Z |
publishDate | 2020-03-01 |
publisher | Gdynia Maritime University |
record_format | Article |
series | TransNav: International Journal on Marine Navigation and Safety of Sea Transportation |
spelling | doaj.art-a1bda03703614649921497ded769a4c52022-12-21T23:02:16ZengGdynia Maritime UniversityTransNav: International Journal on Marine Navigation and Safety of Sea Transportation2083-64732083-64812020-03-01141394210.12716/1001.14.01.03973LNG Carrier Main Steam Turbine Reliability in the Exploatation Period of TimeIgor Poljak0Josip Orovic1Vlatko Knezevic2Vedran Mrzljak3University of Zadar, Zadar, CroatiaUniversity of Zadar, Zadar, CroatiaUniversity of Zadar, Zadar, CroatiaUniversity of Rijeka, CroatiaIn this paper the LNG carrier with steam turbine propulsion plant maintenance records has been analysed. Actual observed data from the ship, built in 2001, are from ship maintenance history data from September 2002 until August 2010. During the analysed period, main propulsion turbine had one major failure and several minor failures. The ship had three dry docks and one was prolonged due to increased requirements for cargo transport. Total running hours of the main propulsion turbine in the observed period of time were 63204 hours. The list of failures and influence of each mentioned failure of main turbine propulsion machinery is discussed and analysed in respect to the propulsion autonomy of the vessel.http://www.transnav.eu/files/LNG Carrier Main Steam Turbine Reliability in the Exploatation Period of Time,973.pdfengine room maintenancelng carriersteam turbineexploatationexploatation period of timemain steam turbinemain propulsion turbinereliability |
spellingShingle | Igor Poljak Josip Orovic Vlatko Knezevic Vedran Mrzljak LNG Carrier Main Steam Turbine Reliability in the Exploatation Period of Time TransNav: International Journal on Marine Navigation and Safety of Sea Transportation engine room maintenance lng carrier steam turbine exploatation exploatation period of time main steam turbine main propulsion turbine reliability |
title | LNG Carrier Main Steam Turbine Reliability in the Exploatation Period of Time |
title_full | LNG Carrier Main Steam Turbine Reliability in the Exploatation Period of Time |
title_fullStr | LNG Carrier Main Steam Turbine Reliability in the Exploatation Period of Time |
title_full_unstemmed | LNG Carrier Main Steam Turbine Reliability in the Exploatation Period of Time |
title_short | LNG Carrier Main Steam Turbine Reliability in the Exploatation Period of Time |
title_sort | lng carrier main steam turbine reliability in the exploatation period of time |
topic | engine room maintenance lng carrier steam turbine exploatation exploatation period of time main steam turbine main propulsion turbine reliability |
url | http://www.transnav.eu/files/LNG Carrier Main Steam Turbine Reliability in the Exploatation Period of Time,973.pdf |
work_keys_str_mv | AT igorpoljak lngcarriermainsteamturbinereliabilityintheexploatationperiodoftime AT josiporovic lngcarriermainsteamturbinereliabilityintheexploatationperiodoftime AT vlatkoknezevic lngcarriermainsteamturbinereliabilityintheexploatationperiodoftime AT vedranmrzljak lngcarriermainsteamturbinereliabilityintheexploatationperiodoftime |