LNG Carrier Main Steam Turbine Reliability in the Exploatation Period of Time

In this paper the LNG carrier with steam turbine propulsion plant maintenance records has been analysed. Actual observed data from the ship, built in 2001, are from ship maintenance history data from September 2002 until August 2010. During the analysed period, main propulsion turbine had one major...

Full description

Bibliographic Details
Main Authors: Igor Poljak, Josip Orovic, Vlatko Knezevic, Vedran Mrzljak
Format: Article
Language:English
Published: Gdynia Maritime University 2020-03-01
Series:TransNav: International Journal on Marine Navigation and Safety of Sea Transportation
Subjects:
Online Access:http://www.transnav.eu/files/LNG Carrier Main Steam Turbine Reliability in the Exploatation Period of Time,973.pdf
_version_ 1818416524593987584
author Igor Poljak
Josip Orovic
Vlatko Knezevic
Vedran Mrzljak
author_facet Igor Poljak
Josip Orovic
Vlatko Knezevic
Vedran Mrzljak
author_sort Igor Poljak
collection DOAJ
description In this paper the LNG carrier with steam turbine propulsion plant maintenance records has been analysed. Actual observed data from the ship, built in 2001, are from ship maintenance history data from September 2002 until August 2010. During the analysed period, main propulsion turbine had one major failure and several minor failures. The ship had three dry docks and one was prolonged due to increased requirements for cargo transport. Total running hours of the main propulsion turbine in the observed period of time were 63204 hours. The list of failures and influence of each mentioned failure of main turbine propulsion machinery is discussed and analysed in respect to the propulsion autonomy of the vessel.
first_indexed 2024-12-14T11:52:16Z
format Article
id doaj.art-a1bda03703614649921497ded769a4c5
institution Directory Open Access Journal
issn 2083-6473
2083-6481
language English
last_indexed 2024-12-14T11:52:16Z
publishDate 2020-03-01
publisher Gdynia Maritime University
record_format Article
series TransNav: International Journal on Marine Navigation and Safety of Sea Transportation
spelling doaj.art-a1bda03703614649921497ded769a4c52022-12-21T23:02:16ZengGdynia Maritime UniversityTransNav: International Journal on Marine Navigation and Safety of Sea Transportation2083-64732083-64812020-03-01141394210.12716/1001.14.01.03973LNG Carrier Main Steam Turbine Reliability in the Exploatation Period of TimeIgor Poljak0Josip Orovic1Vlatko Knezevic2Vedran Mrzljak3University of Zadar, Zadar, CroatiaUniversity of Zadar, Zadar, CroatiaUniversity of Zadar, Zadar, CroatiaUniversity of Rijeka, CroatiaIn this paper the LNG carrier with steam turbine propulsion plant maintenance records has been analysed. Actual observed data from the ship, built in 2001, are from ship maintenance history data from September 2002 until August 2010. During the analysed period, main propulsion turbine had one major failure and several minor failures. The ship had three dry docks and one was prolonged due to increased requirements for cargo transport. Total running hours of the main propulsion turbine in the observed period of time were 63204 hours. The list of failures and influence of each mentioned failure of main turbine propulsion machinery is discussed and analysed in respect to the propulsion autonomy of the vessel.http://www.transnav.eu/files/LNG Carrier Main Steam Turbine Reliability in the Exploatation Period of Time,973.pdfengine room maintenancelng carriersteam turbineexploatationexploatation period of timemain steam turbinemain propulsion turbinereliability
spellingShingle Igor Poljak
Josip Orovic
Vlatko Knezevic
Vedran Mrzljak
LNG Carrier Main Steam Turbine Reliability in the Exploatation Period of Time
TransNav: International Journal on Marine Navigation and Safety of Sea Transportation
engine room maintenance
lng carrier
steam turbine
exploatation
exploatation period of time
main steam turbine
main propulsion turbine
reliability
title LNG Carrier Main Steam Turbine Reliability in the Exploatation Period of Time
title_full LNG Carrier Main Steam Turbine Reliability in the Exploatation Period of Time
title_fullStr LNG Carrier Main Steam Turbine Reliability in the Exploatation Period of Time
title_full_unstemmed LNG Carrier Main Steam Turbine Reliability in the Exploatation Period of Time
title_short LNG Carrier Main Steam Turbine Reliability in the Exploatation Period of Time
title_sort lng carrier main steam turbine reliability in the exploatation period of time
topic engine room maintenance
lng carrier
steam turbine
exploatation
exploatation period of time
main steam turbine
main propulsion turbine
reliability
url http://www.transnav.eu/files/LNG Carrier Main Steam Turbine Reliability in the Exploatation Period of Time,973.pdf
work_keys_str_mv AT igorpoljak lngcarriermainsteamturbinereliabilityintheexploatationperiodoftime
AT josiporovic lngcarriermainsteamturbinereliabilityintheexploatationperiodoftime
AT vlatkoknezevic lngcarriermainsteamturbinereliabilityintheexploatationperiodoftime
AT vedranmrzljak lngcarriermainsteamturbinereliabilityintheexploatationperiodoftime