Optimizing the Preventive Maintenance Scheduling Based on Dynamic Deterministic Demand in The Cement Manufacturing

Preventive maintenance is a planned and scheduled maintenance method that is carried out before a machine failure occurs. The maintenance schedule can be determined based on experience, historical data, or recommendations. Selecting the maintenance schedule greatly affects the production system. The...

Full description

Bibliographic Details
Main Authors: Halim Qista Karima, Fauzan Romadlon
Format: Article
Language:English
Published: Muhammadiyah University Press 2021-07-01
Series:Jurnal Ilmiah Teknik Industri
Subjects:
Online Access:https://journals.ums.ac.id/index.php/jiti/article/view/13894
_version_ 1818595944527036416
author Halim Qista Karima
Fauzan Romadlon
author_facet Halim Qista Karima
Fauzan Romadlon
author_sort Halim Qista Karima
collection DOAJ
description Preventive maintenance is a planned and scheduled maintenance method that is carried out before a machine failure occurs. The maintenance schedule can be determined based on experience, historical data, or recommendations. Selecting the maintenance schedule greatly affects the production system. The Clin machine in cement manufacturing has an important role in the cement production process. During treatment, the client machine cannot produce clinker, so it is necessary to plan a production system to meet the demand. This paper aims to design an optimization model for determining the preventive maintenance schedule for cement manufacturing by considering the production process and inventory control. Mathematical models with binary options are used to model that system. The model supports showing the optimal preventive maintenance schedule for the ciln machines with a binary decision each period. This mathematical model describes the interaction of production planning, inventory control, and scheduling of total maintenance on a kiln machine. The goal of this system is to determine the optimal preventive maintenance schedule with minimum costs. In addition, the system's output is the optimal production and inventory decision rule for each period. Based on the analysis and simulation of the model with the deterministic and dynamic demand, the optimal preventive maintenance schedule is in the 9th and 21st periods. The kiln machines are maintained every July with minimal costs. The model scenario shows the interaction of the variables and the sensitivity of the production capacity and demand to the decision rule of the variable.
first_indexed 2024-12-16T11:24:04Z
format Article
id doaj.art-a27006c71ab0454586eb459650fd6668
institution Directory Open Access Journal
issn 1412-6869
2460-4038
language English
last_indexed 2024-12-16T11:24:04Z
publishDate 2021-07-01
publisher Muhammadiyah University Press
record_format Article
series Jurnal Ilmiah Teknik Industri
spelling doaj.art-a27006c71ab0454586eb459650fd66682022-12-21T22:33:24ZengMuhammadiyah University PressJurnal Ilmiah Teknik Industri1412-68692460-40382021-07-0120110911810.23917/jiti.v20i1.138946479Optimizing the Preventive Maintenance Scheduling Based on Dynamic Deterministic Demand in The Cement ManufacturingHalim Qista Karima0Fauzan RomadlonInstitut Teknologi Telkom PurwokertoPreventive maintenance is a planned and scheduled maintenance method that is carried out before a machine failure occurs. The maintenance schedule can be determined based on experience, historical data, or recommendations. Selecting the maintenance schedule greatly affects the production system. The Clin machine in cement manufacturing has an important role in the cement production process. During treatment, the client machine cannot produce clinker, so it is necessary to plan a production system to meet the demand. This paper aims to design an optimization model for determining the preventive maintenance schedule for cement manufacturing by considering the production process and inventory control. Mathematical models with binary options are used to model that system. The model supports showing the optimal preventive maintenance schedule for the ciln machines with a binary decision each period. This mathematical model describes the interaction of production planning, inventory control, and scheduling of total maintenance on a kiln machine. The goal of this system is to determine the optimal preventive maintenance schedule with minimum costs. In addition, the system's output is the optimal production and inventory decision rule for each period. Based on the analysis and simulation of the model with the deterministic and dynamic demand, the optimal preventive maintenance schedule is in the 9th and 21st periods. The kiln machines are maintained every July with minimal costs. The model scenario shows the interaction of the variables and the sensitivity of the production capacity and demand to the decision rule of the variable.https://journals.ums.ac.id/index.php/jiti/article/view/13894optimizationpreventive maintenanceproduction process: cement manufacturing
spellingShingle Halim Qista Karima
Fauzan Romadlon
Optimizing the Preventive Maintenance Scheduling Based on Dynamic Deterministic Demand in The Cement Manufacturing
Jurnal Ilmiah Teknik Industri
optimization
preventive maintenance
production process: cement manufacturing
title Optimizing the Preventive Maintenance Scheduling Based on Dynamic Deterministic Demand in The Cement Manufacturing
title_full Optimizing the Preventive Maintenance Scheduling Based on Dynamic Deterministic Demand in The Cement Manufacturing
title_fullStr Optimizing the Preventive Maintenance Scheduling Based on Dynamic Deterministic Demand in The Cement Manufacturing
title_full_unstemmed Optimizing the Preventive Maintenance Scheduling Based on Dynamic Deterministic Demand in The Cement Manufacturing
title_short Optimizing the Preventive Maintenance Scheduling Based on Dynamic Deterministic Demand in The Cement Manufacturing
title_sort optimizing the preventive maintenance scheduling based on dynamic deterministic demand in the cement manufacturing
topic optimization
preventive maintenance
production process: cement manufacturing
url https://journals.ums.ac.id/index.php/jiti/article/view/13894
work_keys_str_mv AT halimqistakarima optimizingthepreventivemaintenanceschedulingbasedondynamicdeterministicdemandinthecementmanufacturing
AT fauzanromadlon optimizingthepreventivemaintenanceschedulingbasedondynamicdeterministicdemandinthecementmanufacturing