Repetitive Construction Scheduling for Solo-Yogyakarta-NYIA Kulon Progo Toll Road Overpass using Line of Balance
Repetitive construction requires continuous and uninterrupted supply of resources; hence, a suitable scheduling method that matches the work characteristics is required. Line of Balance is a scheduling method in the form of a line chart that represents recurring work. Considering the existing work i...
Main Authors: | Agung Budiwirawan, Edwin Firgyan Raharja, Muhammad Faizal Ardhiansyah Arifin |
---|---|
Format: | Article |
Language: | English |
Published: |
Universitas Negeri Semarang
2023-10-01
|
Series: | Jurnal Teknik Sipil dan Perencanaan |
Subjects: | |
Online Access: | https://journal.unnes.ac.id/nju/jtsp/article/view/44489 |
Similar Items
-
Calculation of Continuous Reinforced Concrete Bridges And Overpasses Inseismically Hazardous Areas
by: Shermukhamedov U.Z., et al.
Published: (2023-01-01) -
Wildlife overpass structure size, distribution, effectiveness, and adherence to expert design recommendations
by: Liam Brennan, et al.
Published: (2022-12-01) -
Femtosecond Laser Direct Writing of Optical Overpass
by: Xiaochuan Ding, et al.
Published: (2022-07-01) -
Inspection and Preparation for Testing of the Road Overpass of the Almaty-Kapshagai Highway after the Vehicular Impacts
by: Assylkhan Jalairov, et al.
Published: (2022-10-01) -
Automatic Identification of Overpass Structures: A Method of Deep Learning
by: Hao Li, et al.
Published: (2019-09-01)