Corrigendum to “Analytical Method for Evaluating the Ground Surface Settlement Caused by Tail Void Grouting Pressure in Shield Tunnel Construction”
主要な著者: | , |
---|---|
フォーマット: | 論文 |
言語: | English |
出版事項: |
Wiley
2019-01-01
|
シリーズ: | Advances in Civil Engineering |
オンライン・アクセス: | http://dx.doi.org/10.1155/2019/9481728 |
_version_ | 1826827521822294016 |
---|---|
author | Changsheng Wu Zhiduo Zhu |
author_facet | Changsheng Wu Zhiduo Zhu |
author_sort | Changsheng Wu |
collection | DOAJ |
first_indexed | 2025-02-16T08:32:15Z |
format | Article |
id | doaj.art-a467b3ecf1034eb08935d3e1a70a99b0 |
institution | Directory Open Access Journal |
issn | 1687-8086 1687-8094 |
language | English |
last_indexed | 2025-02-16T08:32:15Z |
publishDate | 2019-01-01 |
publisher | Wiley |
record_format | Article |
series | Advances in Civil Engineering |
spelling | doaj.art-a467b3ecf1034eb08935d3e1a70a99b02025-02-03T05:50:52ZengWileyAdvances in Civil Engineering1687-80861687-80942019-01-01201910.1155/2019/94817289481728Corrigendum to “Analytical Method for Evaluating the Ground Surface Settlement Caused by Tail Void Grouting Pressure in Shield Tunnel Construction”Changsheng Wu0Zhiduo Zhu1Institute of Geotechnical Engineering, Southeast University, Nanjing 210096, ChinaInstitute of Geotechnical Engineering, Southeast University, Nanjing 210096, Chinahttp://dx.doi.org/10.1155/2019/9481728 |
spellingShingle | Changsheng Wu Zhiduo Zhu Corrigendum to “Analytical Method for Evaluating the Ground Surface Settlement Caused by Tail Void Grouting Pressure in Shield Tunnel Construction” Advances in Civil Engineering |
title | Corrigendum to “Analytical Method for Evaluating the Ground Surface Settlement Caused by Tail Void Grouting Pressure in Shield Tunnel Construction” |
title_full | Corrigendum to “Analytical Method for Evaluating the Ground Surface Settlement Caused by Tail Void Grouting Pressure in Shield Tunnel Construction” |
title_fullStr | Corrigendum to “Analytical Method for Evaluating the Ground Surface Settlement Caused by Tail Void Grouting Pressure in Shield Tunnel Construction” |
title_full_unstemmed | Corrigendum to “Analytical Method for Evaluating the Ground Surface Settlement Caused by Tail Void Grouting Pressure in Shield Tunnel Construction” |
title_short | Corrigendum to “Analytical Method for Evaluating the Ground Surface Settlement Caused by Tail Void Grouting Pressure in Shield Tunnel Construction” |
title_sort | corrigendum to analytical method for evaluating the ground surface settlement caused by tail void grouting pressure in shield tunnel construction |
url | http://dx.doi.org/10.1155/2019/9481728 |
work_keys_str_mv | AT changshengwu corrigendumtoanalyticalmethodforevaluatingthegroundsurfacesettlementcausedbytailvoidgroutingpressureinshieldtunnelconstruction AT zhiduozhu corrigendumtoanalyticalmethodforevaluatingthegroundsurfacesettlementcausedbytailvoidgroutingpressureinshieldtunnelconstruction |