Corrigendum to “Analytical Method for Evaluating the Ground Surface Settlement Caused by Tail Void Grouting Pressure in Shield Tunnel Construction”
Hlavní autoři: | , |
---|---|
Médium: | Článek |
Jazyk: | English |
Vydáno: |
Wiley
2019-01-01
|
Edice: | Advances in Civil Engineering |
On-line přístup: | http://dx.doi.org/10.1155/2019/9481728 |