Rancang bangun pabrik pengolahan kulit kelinci menjadi kulit kelinci berbulu samak krom skala kecil

This paper is prepared for a design of a small scale chorme tanning factory, processing fur rabbit leather. The capacity of it will be 200 pieces/day green rabbit skin. This factory will be profitable in the view of techno – economical calculations are as follows : the total capital is fixed cap...

Full description

Bibliographic Details
Main Authors: Harniniek Harniniek, Titik Purwati Widowati
Format: Article
Language:English
Published: Center for Leather, Rubber, and Plastics 1988-06-01
Series:Majalah Kulit, Karet, dan Plastik
Online Access:http://ejournal.kemenperin.go.id/mkkp/article/view/287/263
Description
Summary:This paper is prepared for a design of a small scale chorme tanning factory, processing fur rabbit leather. The capacity of it will be 200 pieces/day green rabbit skin. This factory will be profitable in the view of techno – economical calculations are as follows : the total capital is fixed capital + working capital = Rp 49.276.532,00 the total production cost is variable cost for a year + fixed cost for a year = Rp. 41.241.203,76 variable cost for a year consists of raw material, packing, chemical/supplement material electricity, fixed cost of a year consists of labour salaries, capital interest, maintenance, depreciation and general expences; the manufacturing cost is the total production divided by production capacity = Rp. 700,85 / sq. ft; the profit calculation before taxing is Rp. 14.682.636,24, after taxing id Rp. 11.746.108,99; the pay out period calculation consists of the percentage of profit to return the capital (rate of return) before taxing is 29,80 %, 3 years, after taxing 3 years 8 months; the break even point calculations is the break even point is the Rp. 28.768.403,47 the percentage of break even point is 51,44 % and the capacity of break even point is 30.281,29 sq. ft.
ISSN:1829-6971
2460-4461