Analisis Percepatan Waktu Dan Biaya Proyek Konstruksi Dengan Penambahan Jam Kerja (Lembur) Menggunakan Metode Time Cost Trade Off : Studi Kasus Proyek Pembangunan Prasarana Pengendali Banjir
<span>Time and cost have significanteffect on the success and failure of the projects.The<br /><span>benchmark for the success project is usually seen by short finishing time with the<br /><span>minimum cost without leaving the quality.Project management systematically...
Main Authors: | Mandiyo Priyo, Adi Sumanto |
---|---|
Format: | Article |
Language: | English |
Published: |
Universitas Muhammadiyah Yogyakarta
2016-12-01
|
Series: | Semesta Teknika |
Online Access: | https://journal.umy.ac.id/index.php/st/article/view/2233 |
Similar Items
-
Studi Optimasi Waktu dan Biaya dengan Metode Time Cost Trade Off pada Proyek Konstruksi : Studi Kasus Proyek Jalan Bugel-Galur-Poncosari Cs. Tahap I, Provinsi D.I. Yogyakarta
by: Mandiyo Priyo, et al.
Published: (2017-11-01) -
Aplikasi Value Engineering pada Proyek Konstruksi (Studi Kasus: Proyek Pembangunan Gedung BPKP Yogyakarta)
by: Mandiyo Priyo, et al.
Published: (2016-03-01) -
Konsep Earned Value dalam Aplikasi Pengelolaan Proyek Konstruksi
by: Mandiyo Priyo, et al.
Published: (2016-05-01) -
Aplikasi Metode Time Cost Trade Off Pada Proyek Konstruksi: Studi Kasus Proyek Pembangunan Gedung Indonesia
by: Mandiyo Priyo, et al.
Published: (2016-01-01) -
Studi Kelayakan Investasi Proyek Perumahan pada Proyek Pembangunan Perumahan Aura Tirta Graha Banjarnegara
by: Mandiyo Priyo
Published: (2016-03-01)