Lost Gas Mechanism and Quantitative Characterization during Injection and Production of Water-Flooded Sandstone Underground Gas Storage
A gas–water two-phase fluid is present in a reservoir before a water-flooded sandstone gas reservoir is rebuilt. Therefore, in the process of injection and production of the rebuilt underground gas storage, the injected gas is easily blocked by the water in the pores, and the efficiency is low, resu...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2018-01-01
|
Series: | Energies |
Subjects: | |
Online Access: | http://www.mdpi.com/1996-1073/11/2/272 |