Providing a proper model for the implementation of maintenance systemin thecontinuous production linesconcidering decision making models and fuzzy goal programming
the requirements for maintenance management have change drastically from the old concept of ‘fix-it-when-broken’ to a more complex approach, which entails adopting a maintenance strategy for a more integrated approach and alignment. This paper presents a Goal Programming (GP) approach to define the...
Main Authors: | Ali Rabbani, Habib Zare, Foroogh Behnia |
---|---|
Format: | Article |
Language: | fas |
Published: |
Allameh Tabataba'i University Press
2014-12-01
|
Series: | Muṭāli̒āt-i Mudīriyyat-i Ṣan̒atī |
Subjects: | |
Online Access: | https://jims.atu.ac.ir/article_192_63627f61df910cd228cf92c9346845e0.pdf |
Similar Items
-
Combining Reliability-Centered Maintenance with Planning Methodology and Applications in Hard Chrome Plating Plants
by: B. Suthep, et al.
Published: (2015-07-01) -
The study of Influencing Maintenance Factors on Failures of Two gypsum Kilns by Failure Modes and Effects Analysis (FMEA)
by: Iraj Alimohammadi, et al.
Published: (2014-06-01) -
Perencanaan Perawatan Mesin Kompresor Pada PT. Es Muda Perkasa Dengan Metode Reliability Centered Maintenance (RCM)
by: Ikramullah Zein, et al.
Published: (2019-02-01) -
Suitable computerized maintenance management system selection using grey group TOPSIS and fuzzy group VIKOR: A case study
by: Amir Zare, et al.
Published: (2018-09-01) -
Improvement of the maintenance management process of complex technical systems which demand high reliability
by: Ivan Beker, et al.
Published: (2017-01-01)