Remaining service life prediction using road structure performance data with pavement condition index (PCI) and Benkelman beam (BB) methods

The design life of a road is the amount of time a road can take from the time the road is used until the road requires major repairs. The inability of a pavement to reach its design life can be caused by several factors. These factors cause the uncertainty of the service life of the road, so that th...

Full description

Bibliographic Details
Main Authors: Handayani Fajar Sri, Setyawan Ary, Pramesti Florentina Pungky, Widhiarti Nugraheni
Format: Article
Language:English
Published: EDP Sciences 2023-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2023/66/e3sconf_iccim2023_05021.pdf
_version_ 1797673532728016896
author Handayani Fajar Sri
Setyawan Ary
Pramesti Florentina Pungky
Widhiarti Nugraheni
author_facet Handayani Fajar Sri
Setyawan Ary
Pramesti Florentina Pungky
Widhiarti Nugraheni
author_sort Handayani Fajar Sri
collection DOAJ
description The design life of a road is the amount of time a road can take from the time the road is used until the road requires major repairs. The inability of a pavement to reach its design life can be caused by several factors. These factors cause the uncertainty of the service life of the road, so that the remaining service life of the pavement becomes difficult to predict. This study will discuss the condition of the road pavement and predict the remaining service life on the Losari - Pejagan road, Demak ring road, and Rembang - Bulu road sections using the PCI (Pavement Condition Index) and Benkelman Beam (BB) methods. Based on the analysis of road condition assessment, the average PCI value for the Losari - Pejagan road section is 45.76 (poor), for the Demak Ring road section is 74.63 (satisfactory), and for the Rembang - Bulu road section is 50.41 (poor). The results of the analysis of the remaining service life using the PCI method found that 67.2% of all segments on the three road had a remaining service life of less than a year and 32.8% of all segments had a remaining service life of more than 1 year. Using the BB method, it was found that the remaining service life of 93.7% segments on the three road are less than a year and 6.7% segments are more than 1 year.
first_indexed 2024-03-11T21:45:49Z
format Article
id doaj.art-a7a75e9130d84e879282bb7e8ff23f5b
institution Directory Open Access Journal
issn 2267-1242
language English
last_indexed 2024-03-11T21:45:49Z
publishDate 2023-01-01
publisher EDP Sciences
record_format Article
series E3S Web of Conferences
spelling doaj.art-a7a75e9130d84e879282bb7e8ff23f5b2023-09-26T10:12:14ZengEDP SciencesE3S Web of Conferences2267-12422023-01-014290502110.1051/e3sconf/202342905021e3sconf_iccim2023_05021Remaining service life prediction using road structure performance data with pavement condition index (PCI) and Benkelman beam (BB) methodsHandayani Fajar Sri0Setyawan Ary1Pramesti Florentina Pungky2Widhiarti Nugraheni3Civil Engineering Department, Faculty of Engineering, Sebelas Maret UniversityCivil Engineering Department, Faculty of Engineering, Sebelas Maret UniversityCivil Engineering Department, Faculty of Engineering, Sebelas Maret UniversityCivil Engineering Department, Faculty of Engineering, Sebelas Maret UniversityThe design life of a road is the amount of time a road can take from the time the road is used until the road requires major repairs. The inability of a pavement to reach its design life can be caused by several factors. These factors cause the uncertainty of the service life of the road, so that the remaining service life of the pavement becomes difficult to predict. This study will discuss the condition of the road pavement and predict the remaining service life on the Losari - Pejagan road, Demak ring road, and Rembang - Bulu road sections using the PCI (Pavement Condition Index) and Benkelman Beam (BB) methods. Based on the analysis of road condition assessment, the average PCI value for the Losari - Pejagan road section is 45.76 (poor), for the Demak Ring road section is 74.63 (satisfactory), and for the Rembang - Bulu road section is 50.41 (poor). The results of the analysis of the remaining service life using the PCI method found that 67.2% of all segments on the three road had a remaining service life of less than a year and 32.8% of all segments had a remaining service life of more than 1 year. Using the BB method, it was found that the remaining service life of 93.7% segments on the three road are less than a year and 6.7% segments are more than 1 year.https://www.e3s-conferences.org/articles/e3sconf/pdf/2023/66/e3sconf_iccim2023_05021.pdf
spellingShingle Handayani Fajar Sri
Setyawan Ary
Pramesti Florentina Pungky
Widhiarti Nugraheni
Remaining service life prediction using road structure performance data with pavement condition index (PCI) and Benkelman beam (BB) methods
E3S Web of Conferences
title Remaining service life prediction using road structure performance data with pavement condition index (PCI) and Benkelman beam (BB) methods
title_full Remaining service life prediction using road structure performance data with pavement condition index (PCI) and Benkelman beam (BB) methods
title_fullStr Remaining service life prediction using road structure performance data with pavement condition index (PCI) and Benkelman beam (BB) methods
title_full_unstemmed Remaining service life prediction using road structure performance data with pavement condition index (PCI) and Benkelman beam (BB) methods
title_short Remaining service life prediction using road structure performance data with pavement condition index (PCI) and Benkelman beam (BB) methods
title_sort remaining service life prediction using road structure performance data with pavement condition index pci and benkelman beam bb methods
url https://www.e3s-conferences.org/articles/e3sconf/pdf/2023/66/e3sconf_iccim2023_05021.pdf
work_keys_str_mv AT handayanifajarsri remainingservicelifepredictionusingroadstructureperformancedatawithpavementconditionindexpciandbenkelmanbeambbmethods
AT setyawanary remainingservicelifepredictionusingroadstructureperformancedatawithpavementconditionindexpciandbenkelmanbeambbmethods
AT pramestiflorentinapungky remainingservicelifepredictionusingroadstructureperformancedatawithpavementconditionindexpciandbenkelmanbeambbmethods
AT widhiartinugraheni remainingservicelifepredictionusingroadstructureperformancedatawithpavementconditionindexpciandbenkelmanbeambbmethods