Optimization Study on Carbon Trading and Constructive Repetitive Project Scheduling in the Context of Internet Era
This paper constructs a carbon trading market trade-off problem model based on the time-constrained relationship of process families in RSM. By analyzing the repetitive construction project processes, linear, block, and strip processes are refined. The time-constrained relationship between process f...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Sciendo
2024-01-01
|
Series: | Applied Mathematics and Nonlinear Sciences |
Subjects: | |
Online Access: | https://doi.org/10.2478/amns.2023.2.00679 |
_version_ | 1797340701327884288 |
---|---|
author | Zhou Lin Guo Xinyu Wang Hao |
author_facet | Zhou Lin Guo Xinyu Wang Hao |
author_sort | Zhou Lin |
collection | DOAJ |
description | This paper constructs a carbon trading market trade-off problem model based on the time-constrained relationship of process families in RSM. By analyzing the repetitive construction project processes, linear, block, and strip processes are refined. The time-constrained relationship between process families in the RSM is studied, and the expression formula is derived. Process continuity and resource continuity in repetitive construction projects are analyzed to reduce the time required to complete a unit of work. The process duration of the project is determined by optimizing the amount of new resources and human resources used. The results show that when the length of the carbon emission interval is at (0.5, 2]t, when the length of the carbon emission interval is small, the role of RSM process time carbon trading price is larger. |
first_indexed | 2024-03-08T10:07:02Z |
format | Article |
id | doaj.art-a7f4bdf1768c4bd2b29f35546a89278b |
institution | Directory Open Access Journal |
issn | 2444-8656 |
language | English |
last_indexed | 2024-03-08T10:07:02Z |
publishDate | 2024-01-01 |
publisher | Sciendo |
record_format | Article |
series | Applied Mathematics and Nonlinear Sciences |
spelling | doaj.art-a7f4bdf1768c4bd2b29f35546a89278b2024-01-29T08:52:35ZengSciendoApplied Mathematics and Nonlinear Sciences2444-86562024-01-019110.2478/amns.2023.2.00679Optimization Study on Carbon Trading and Constructive Repetitive Project Scheduling in the Context of Internet EraZhou Lin0Guo Xinyu1Wang Hao21North China Electric Power University, Beijing, 071003, China.1North China Electric Power University, Beijing, 071003, China.1North China Electric Power University, Beijing, 071003, China.This paper constructs a carbon trading market trade-off problem model based on the time-constrained relationship of process families in RSM. By analyzing the repetitive construction project processes, linear, block, and strip processes are refined. The time-constrained relationship between process families in the RSM is studied, and the expression formula is derived. Process continuity and resource continuity in repetitive construction projects are analyzed to reduce the time required to complete a unit of work. The process duration of the project is determined by optimizing the amount of new resources and human resources used. The results show that when the length of the carbon emission interval is at (0.5, 2]t, when the length of the carbon emission interval is small, the role of RSM process time carbon trading price is larger.https://doi.org/10.2478/amns.2023.2.00679rsmtime-constrained relationshipresource continuitycarbon trading market trade-off91-02 |
spellingShingle | Zhou Lin Guo Xinyu Wang Hao Optimization Study on Carbon Trading and Constructive Repetitive Project Scheduling in the Context of Internet Era Applied Mathematics and Nonlinear Sciences rsm time-constrained relationship resource continuity carbon trading market trade-off 91-02 |
title | Optimization Study on Carbon Trading and Constructive Repetitive Project Scheduling in the Context of Internet Era |
title_full | Optimization Study on Carbon Trading and Constructive Repetitive Project Scheduling in the Context of Internet Era |
title_fullStr | Optimization Study on Carbon Trading and Constructive Repetitive Project Scheduling in the Context of Internet Era |
title_full_unstemmed | Optimization Study on Carbon Trading and Constructive Repetitive Project Scheduling in the Context of Internet Era |
title_short | Optimization Study on Carbon Trading and Constructive Repetitive Project Scheduling in the Context of Internet Era |
title_sort | optimization study on carbon trading and constructive repetitive project scheduling in the context of internet era |
topic | rsm time-constrained relationship resource continuity carbon trading market trade-off 91-02 |
url | https://doi.org/10.2478/amns.2023.2.00679 |
work_keys_str_mv | AT zhoulin optimizationstudyoncarbontradingandconstructiverepetitiveprojectschedulinginthecontextofinternetera AT guoxinyu optimizationstudyoncarbontradingandconstructiverepetitiveprojectschedulinginthecontextofinternetera AT wanghao optimizationstudyoncarbontradingandconstructiverepetitiveprojectschedulinginthecontextofinternetera |