Full-time and space early-warning method for floor water inrush in working face based on microseismic monitoring

To explore the difference of microseismic characteristics in different periods and spaces of the working face and then realize the early warning of water damage, a full-time and space early-warning method for floor water inrush based on microseismic monitoring was proposed based on typical case anal...

Full description

Bibliographic Details
Main Authors: XU Yanchun, HUANG Lei
Format: Article
Language:zho
Published: Editorial Department of Coal Science and Technology 2023-01-01
Series:Meitan kexue jishu
Subjects:
Online Access:http://www.mtkxjs.com.cn/article/doi/10.13199/j.cnki.cst.2022-1286
_version_ 1797816749057376256
author XU Yanchun
HUANG Lei
author_facet XU Yanchun
HUANG Lei
author_sort XU Yanchun
collection DOAJ
description To explore the difference of microseismic characteristics in different periods and spaces of the working face and then realize the early warning of water damage, a full-time and space early-warning method for floor water inrush based on microseismic monitoring was proposed based on typical case analysis. The so-called “full-time and space” refers to the 3 time periods of the whole time cycle of the working face, including pre-mining period, advanced-mining period, and mining period, and the 7 evaluation zones of the whole space of the working face. In the first period, based on the engineering information of boreholes and microseismic response characteristics, the expression method of water inrush risk was formed, and the primary abnormal zones were determined, thus realizing the long-term prediction of water inrush risk in the pre-mining period. In the second period, the fixed working face was set up and the microseismic events were repositioned. Based on the nuclear density analysis of the frequency and energy of microseismic events at the “fixed working face”, the water inrush characteristics of the leading influence zone, the lagging influence zone and the lateral influence zone were determined, realizing the water inrush risk early-warning in the advanced mining period. In the third period, the 2D-CE method was introduced to normalize the microseismic events on the plane, the early-warning aquifer was defined, and the roof damage zone, the floor damage zone, and the floor mining damage zone were determined in combination with the frequency of microseismic events and the energy nuclear density analysis, realizing the water inrush risk prediction in the mining period. At the same time, according to the mining verification results, the prediction method in the early phase was modified to serve the water inrush early warning in the subsequent working face, making the prediction results of floor water inrush more accurate in Jiaozuo and Hanxing mining areas.
first_indexed 2024-03-13T08:42:18Z
format Article
id doaj.art-a82934898ffe415a8d08da901ef05c73
institution Directory Open Access Journal
issn 0253-2336
language zho
last_indexed 2024-03-13T08:42:18Z
publishDate 2023-01-01
publisher Editorial Department of Coal Science and Technology
record_format Article
series Meitan kexue jishu
spelling doaj.art-a82934898ffe415a8d08da901ef05c732023-05-30T08:53:39ZzhoEditorial Department of Coal Science and TechnologyMeitan kexue jishu0253-23362023-01-0151136938210.13199/j.cnki.cst.2022-12862022-1286Full-time and space early-warning method for floor water inrush in working face based on microseismic monitoringXU YanchunHUANG LeiTo explore the difference of microseismic characteristics in different periods and spaces of the working face and then realize the early warning of water damage, a full-time and space early-warning method for floor water inrush based on microseismic monitoring was proposed based on typical case analysis. The so-called “full-time and space” refers to the 3 time periods of the whole time cycle of the working face, including pre-mining period, advanced-mining period, and mining period, and the 7 evaluation zones of the whole space of the working face. In the first period, based on the engineering information of boreholes and microseismic response characteristics, the expression method of water inrush risk was formed, and the primary abnormal zones were determined, thus realizing the long-term prediction of water inrush risk in the pre-mining period. In the second period, the fixed working face was set up and the microseismic events were repositioned. Based on the nuclear density analysis of the frequency and energy of microseismic events at the “fixed working face”, the water inrush characteristics of the leading influence zone, the lagging influence zone and the lateral influence zone were determined, realizing the water inrush risk early-warning in the advanced mining period. In the third period, the 2D-CE method was introduced to normalize the microseismic events on the plane, the early-warning aquifer was defined, and the roof damage zone, the floor damage zone, and the floor mining damage zone were determined in combination with the frequency of microseismic events and the energy nuclear density analysis, realizing the water inrush risk prediction in the mining period. At the same time, according to the mining verification results, the prediction method in the early phase was modified to serve the water inrush early warning in the subsequent working face, making the prediction results of floor water inrush more accurate in Jiaozuo and Hanxing mining areas.http://www.mtkxjs.com.cn/article/doi/10.13199/j.cnki.cst.2022-1286microseismic monitoringfull-time and spacefloor water inrushwater inrush precursorearly warning method
spellingShingle XU Yanchun
HUANG Lei
Full-time and space early-warning method for floor water inrush in working face based on microseismic monitoring
Meitan kexue jishu
microseismic monitoring
full-time and space
floor water inrush
water inrush precursor
early warning method
title Full-time and space early-warning method for floor water inrush in working face based on microseismic monitoring
title_full Full-time and space early-warning method for floor water inrush in working face based on microseismic monitoring
title_fullStr Full-time and space early-warning method for floor water inrush in working face based on microseismic monitoring
title_full_unstemmed Full-time and space early-warning method for floor water inrush in working face based on microseismic monitoring
title_short Full-time and space early-warning method for floor water inrush in working face based on microseismic monitoring
title_sort full time and space early warning method for floor water inrush in working face based on microseismic monitoring
topic microseismic monitoring
full-time and space
floor water inrush
water inrush precursor
early warning method
url http://www.mtkxjs.com.cn/article/doi/10.13199/j.cnki.cst.2022-1286
work_keys_str_mv AT xuyanchun fulltimeandspaceearlywarningmethodforfloorwaterinrushinworkingfacebasedonmicroseismicmonitoring
AT huanglei fulltimeandspaceearlywarningmethodforfloorwaterinrushinworkingfacebasedonmicroseismicmonitoring