Research on Loading Scheme for Large-Scale Model Tests of Super-Long-Span Arch Bridge

A reasonable and efficient loading scheme is needed to guarantee the success of large-scale bridge tests. In this study, an array-type, self-balancing pulley-group loading system was designed based on the world’s largest spanning arch bridge using a 1:10 scale model test. Automatic statistics of the...

Full description

Bibliographic Details
Main Authors: Yonghui Fan, Jianting Zhou, Chao Luo, Jun Yang, Jingzhou Xin, Shaorui Wang
Format: Article
Language:English
Published: MDPI AG 2023-06-01
Series:Buildings
Subjects:
Online Access:https://www.mdpi.com/2075-5309/13/7/1639
_version_ 1797590048334413824
author Yonghui Fan
Jianting Zhou
Chao Luo
Jun Yang
Jingzhou Xin
Shaorui Wang
author_facet Yonghui Fan
Jianting Zhou
Chao Luo
Jun Yang
Jingzhou Xin
Shaorui Wang
author_sort Yonghui Fan
collection DOAJ
description A reasonable and efficient loading scheme is needed to guarantee the success of large-scale bridge tests. In this study, an array-type, self-balancing pulley-group loading system was designed based on the world’s largest spanning arch bridge using a 1:10 scale model test. Automatic statistics of the required load at each loading point were realized using ANSYS, and a load optimization algorithm for loading points at different construction stages was proposed. Tests were carried out separately for the loading system using a single set of pulley groups and an array-type pulley group. Finite element models of the model bridge and the original bridge were established separately using ANSYS, and the stress results of different components during different construction stages of the main arch ring were compared. The research results show the following: (1) The load magnification factor of the single-pulley-group loading device is approximately 6.6 times, with a mechanical efficiency of 94.26%. (2) In the array-type loading system, the actual load at each loading point can reach the design value. The self-balancing characteristic of this system can eliminate the impact of vertical deformation of the structure on loading accuracy, verifying the reliability of the system. (3) The simulation results of the original bridge and the model bridge coincide well, and the stress of each component during the construction process has the same trend. At key construction stages, the maximum relative errors of the stress results of the rigid steel frame and the concrete inside the pipe of the two bridges are 8.33% and 9.34%, respectively, and the maximum absolute error of the bottom plate concrete is 0.66 MPa, verifying the correctness of the counterweight-optimization method. The loading scheme proposed in this paper can provide a reference for the design of loading systems with the same type of scale model test.
first_indexed 2024-03-11T01:14:51Z
format Article
id doaj.art-a8e19387977c4af9839dd7b143eef4e1
institution Directory Open Access Journal
issn 2075-5309
language English
last_indexed 2024-03-11T01:14:51Z
publishDate 2023-06-01
publisher MDPI AG
record_format Article
series Buildings
spelling doaj.art-a8e19387977c4af9839dd7b143eef4e12023-11-18T18:36:39ZengMDPI AGBuildings2075-53092023-06-01137163910.3390/buildings13071639Research on Loading Scheme for Large-Scale Model Tests of Super-Long-Span Arch BridgeYonghui Fan0Jianting Zhou1Chao Luo2Jun Yang3Jingzhou Xin4Shaorui Wang5State Key Laboratory of Mountain Bridge and Tunnel Engineering, Chongqing Jiaotong University, Chongqing 400074, ChinaState Key Laboratory of Mountain Bridge and Tunnel Engineering, Chongqing Jiaotong University, Chongqing 400074, ChinaState Key Laboratory of Mountain Bridge and Tunnel Engineering, Chongqing Jiaotong University, Chongqing 400074, ChinaState Key Laboratory of Mountain Bridge and Tunnel Engineering, Chongqing Jiaotong University, Chongqing 400074, ChinaState Key Laboratory of Mountain Bridge and Tunnel Engineering, Chongqing Jiaotong University, Chongqing 400074, ChinaState Key Laboratory of Mountain Bridge and Tunnel Engineering, Chongqing Jiaotong University, Chongqing 400074, ChinaA reasonable and efficient loading scheme is needed to guarantee the success of large-scale bridge tests. In this study, an array-type, self-balancing pulley-group loading system was designed based on the world’s largest spanning arch bridge using a 1:10 scale model test. Automatic statistics of the required load at each loading point were realized using ANSYS, and a load optimization algorithm for loading points at different construction stages was proposed. Tests were carried out separately for the loading system using a single set of pulley groups and an array-type pulley group. Finite element models of the model bridge and the original bridge were established separately using ANSYS, and the stress results of different components during different construction stages of the main arch ring were compared. The research results show the following: (1) The load magnification factor of the single-pulley-group loading device is approximately 6.6 times, with a mechanical efficiency of 94.26%. (2) In the array-type loading system, the actual load at each loading point can reach the design value. The self-balancing characteristic of this system can eliminate the impact of vertical deformation of the structure on loading accuracy, verifying the reliability of the system. (3) The simulation results of the original bridge and the model bridge coincide well, and the stress of each component during the construction process has the same trend. At key construction stages, the maximum relative errors of the stress results of the rigid steel frame and the concrete inside the pipe of the two bridges are 8.33% and 9.34%, respectively, and the maximum absolute error of the bottom plate concrete is 0.66 MPa, verifying the correctness of the counterweight-optimization method. The loading scheme proposed in this paper can provide a reference for the design of loading systems with the same type of scale model test.https://www.mdpi.com/2075-5309/13/7/1639rigid-frame arch bridgescale model testtest designloading systemweight calculation method
spellingShingle Yonghui Fan
Jianting Zhou
Chao Luo
Jun Yang
Jingzhou Xin
Shaorui Wang
Research on Loading Scheme for Large-Scale Model Tests of Super-Long-Span Arch Bridge
Buildings
rigid-frame arch bridge
scale model test
test design
loading system
weight calculation method
title Research on Loading Scheme for Large-Scale Model Tests of Super-Long-Span Arch Bridge
title_full Research on Loading Scheme for Large-Scale Model Tests of Super-Long-Span Arch Bridge
title_fullStr Research on Loading Scheme for Large-Scale Model Tests of Super-Long-Span Arch Bridge
title_full_unstemmed Research on Loading Scheme for Large-Scale Model Tests of Super-Long-Span Arch Bridge
title_short Research on Loading Scheme for Large-Scale Model Tests of Super-Long-Span Arch Bridge
title_sort research on loading scheme for large scale model tests of super long span arch bridge
topic rigid-frame arch bridge
scale model test
test design
loading system
weight calculation method
url https://www.mdpi.com/2075-5309/13/7/1639
work_keys_str_mv AT yonghuifan researchonloadingschemeforlargescalemodeltestsofsuperlongspanarchbridge
AT jiantingzhou researchonloadingschemeforlargescalemodeltestsofsuperlongspanarchbridge
AT chaoluo researchonloadingschemeforlargescalemodeltestsofsuperlongspanarchbridge
AT junyang researchonloadingschemeforlargescalemodeltestsofsuperlongspanarchbridge
AT jingzhouxin researchonloadingschemeforlargescalemodeltestsofsuperlongspanarchbridge
AT shaoruiwang researchonloadingschemeforlargescalemodeltestsofsuperlongspanarchbridge