Short-term forecast of lateral inflow in Boguchanskaya hydropower station reservoir
Relevance of the work. Boguchanskaya hydropower station on the Angara river was put into operation in 2014. It is one of the largest hydraulic engineering constructions in Eastern Siberia. Boguchanskaya hydropower station is designed to meet the growing energy deficit. At project operating mode of t...
Main Authors: | Dmitry Anatolievich Burakov, Lev Aleksandrovich Putintsev |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Tomsk Polytechnic University
2017-09-01
|
Series: | Известия Томского политехнического университета: Инжиниринг георесурсов |
Subjects: | |
Online Access: | http://izvestiya.tpu.ru/archive/article/view/1752 |
Similar Items
-
Short-term forecast of lateral inflow in Boguchanskaya hydropower station reservoir
by: Dmitry Anatolievich Burakov, et al.
Published: (2017-09-01) -
Improving the reservoir inflow prediction using TIGGE ensemble data and hydrological model for Dharoi Dam, India
by: Anant Patel, et al.
Published: (2023-11-01) -
Exploring the role of the long short‐term memory model in improving multi‐step ahead reservoir inflow forecasting
by: Xinran Luo, et al.
Published: (2023-03-01) -
Mid-Term Optimal Scheduling of Low-Head Cascaded Hydropower Stations Considering Inflow Unevenness
by: Shuo Huang, et al.
Published: (2023-09-01) -
Local Inflow Analysis of Jatiluhur Reservoir Using HEC-HMS
by: Dedi Novrizal, et al.
Published: (2023-01-01)