Cut-off Grade Optimization for Maximizing the Output Rate
In the open-pit mining, one of the first decisions that must be made in production planning stage, after completing the design of final pit limits, is determining of the processing plant cut-off grade. Since this grade has an essential effect on operations, choosing the optimum cut-off grade is of c...
Main Authors: | A. Khodayari, A. Jafarnejad |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Tehran
2012-12-01
|
Series: | International Journal of Mining and Geo-Engineering |
Subjects: | |
Online Access: | http://ijmge.ut.ac.ir/article_51325_5e0acff134fa8084db947013ca36236a.pdf |
Similar Items
-
Maximizing the net present value by applying an optimal cut-off grade for long-term planning of the copper open pits
by: Daniel Kržanoviæ, et al.
Published: (2015-07-01) -
Optimizing the cut off grade in Sarcheshmeh copper mine using Lane Quartet Model
by: Maleki B., et al.
Published: (2016-01-01) -
Simultaneous optimization of cut-off grade and capacity of mineral processing plant
by: Farzam Saffariyan, et al.
Published: (2017-08-01) -
Determination and choice of optimal cut-off grade value using 3d modeling on the example of domestic bif deposits
by: O. S. Prokopenko, et al.
Published: (2020-06-01) -
Stripping delay analysis in relation to designed long-term plan of excavation at the open pit Veliki Krivelj
by: Vaduvesković Zoran, et al.
Published: (2013-01-01)