Deterministic analysis of emergency AC power recovery during SB-LOCA along with LOOP accident in Bushehr nuclear power plant
The availability of current AC electrical power is essential for the safe operation and accident recovery of commercial nuclear power plants. Loss of offsite power (LOOP) considers as one of the significant post-Fukushima accidents. When the onsite diesel generators are not recovered in the power pl...
Main Authors: | S.A. Hosseini, A.S. Shirani |
---|---|
Format: | Article |
Language: | fas |
Published: |
Nuclear Science and Technology Research Institute
2021-06-01
|
Series: | مجله علوم و فنون هستهای |
Subjects: | |
Online Access: | https://jonsat.nstri.ir/article_1209_981a4ff4cb9dfe2bea2f13886b4b4afb.pdf |
Similar Items
-
Numerical Simulations with RELAP5-3D and RELAP5/mod3.3 of the Second Experimental Campaign on In-Box LOCA Transients for HCLL TBS
by: Alessandro Venturini, et al.
Published: (2021-07-01) -
Experimental and Numerical Results of LIFUS5/Mod3 Series E Test on In-Box LOCA Transient for WCLL-BB
by: Marica Eboli, et al.
Published: (2021-12-01) -
PbLi/Water Reaction: Experimental Campaign and Modeling Advancements in WPBB EUROfusion Project
by: Marica Eboli, et al.
Published: (2023-11-01) -
Assessment of the core-catcher in the VVER-1000 reactor containment under various severe accidents
by: Farhad Salari, et al.
Published: (2023-01-01) -
Multivariate-coupling LOCA prediction using zLSTM
by: Xichen Li, et al.
Published: (2024-05-01)