Minimizing the Pessimistic Time of Activity in Overhaul Project
The objective of this paper is to analyse some concepts of the project management techniques and the proposed mathematical model for estimating the project completion probability after crashing of PERT/CPM network. The main objective is to minimize the pessimistic time of the activity, which lies on...
Main Authors: | Josip Jukić, Roberto Lujić, Dražen Barković |
---|---|
Format: | Article |
Language: | English |
Published: |
Faculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek
2019-01-01
|
Series: | Tehnički Vjesnik |
Subjects: | |
Online Access: | https://hrcak.srce.hr/file/320423 |
Similar Items
-
Perencanaan dan Pengendalian Proyek dengan Metode Pert - CPM Studi Kasus : Fly Over Ahmad Yani – Karawang
by: Anggara Hayun A
Published: (2005-09-01) -
Activity modes selection for project crashing through deterministic simulation
by: Ashok Mohanty, et al.
Published: (2011-12-01) -
Determinação de caminhos k-críticos em redes PERT DetermInation of K most critical paths in PERT networks
by: José Luiz Contador, et al.
Published: (2007-12-01) -
PENERAPAN METODE PERT DAN CPM DALAM PELAKSANAAN PROYEK PEMBANGUNAN JALAN PAVING UNTUK MENCAPAI EFEKTIVITAS WAKTU PENYELESAIAN PROYEK
by: Eva Dewi Yusdiana, et al.
Published: (2018-12-01) -
THE OPTIMIZATION OF TIME AND COST PROCESS TECHNIQUE
by: Dražen Barković, et al.
Published: (2017-01-01)