Research on Construction Practice of Assembled Substation——A Case in Anhui Xuancheng Xinhang 110kV Substation Project
The assembled substation is a substation construction that is "resource-saving, environment-friendly, and industrialized" through prefabrication and on-site installation. Taking the Xuancheng Xinhang 110kV substation project in Anhui as an example, this paper studies the standardization de...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2019-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/62/e3sconf_icbte2019_02038.pdf |
_version_ | 1818338617490145280 |
---|---|
author | Ximing Chen Dian Bao Chaojun Qian Shao-jie Zhang |
author_facet | Ximing Chen Dian Bao Chaojun Qian Shao-jie Zhang |
author_sort | Ximing Chen |
collection | DOAJ |
description | The assembled substation is a substation construction that is "resource-saving, environment-friendly, and industrialized" through prefabrication and on-site installation. Taking the Xuancheng Xinhang 110kV substation project in Anhui as an example, this paper studies the standardization development of assembled industrial buildings and substations at home and abroad, points out the problems existing in the construction and buildingpractice of the assembled substation, and puts forward relevant suggestions for these problems. |
first_indexed | 2024-12-13T15:13:58Z |
format | Article |
id | doaj.art-ab553648ed674ba79ad6b4b3073e0397 |
institution | Directory Open Access Journal |
issn | 2267-1242 |
language | English |
last_indexed | 2024-12-13T15:13:58Z |
publishDate | 2019-01-01 |
publisher | EDP Sciences |
record_format | Article |
series | E3S Web of Conferences |
spelling | doaj.art-ab553648ed674ba79ad6b4b3073e03972022-12-21T23:40:46ZengEDP SciencesE3S Web of Conferences2267-12422019-01-011360203810.1051/e3sconf/201913602038e3sconf_icbte2019_02038Research on Construction Practice of Assembled Substation——A Case in Anhui Xuancheng Xinhang 110kV Substation ProjectXiming Chen0Dian Bao1Chaojun Qian2Shao-jie Zhang3Anhui Electric Power Engineering Supervision Co., Ltd.State Grid XuanCheng Electric Power Co., Ltd.State Grid Anhui Electric Power Co., Ltd.Construction CompanyAnhui Jianzhu University, BIM Engineering Center of Anhui ProvinceThe assembled substation is a substation construction that is "resource-saving, environment-friendly, and industrialized" through prefabrication and on-site installation. Taking the Xuancheng Xinhang 110kV substation project in Anhui as an example, this paper studies the standardization development of assembled industrial buildings and substations at home and abroad, points out the problems existing in the construction and buildingpractice of the assembled substation, and puts forward relevant suggestions for these problems.https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/62/e3sconf_icbte2019_02038.pdf |
spellingShingle | Ximing Chen Dian Bao Chaojun Qian Shao-jie Zhang Research on Construction Practice of Assembled Substation——A Case in Anhui Xuancheng Xinhang 110kV Substation Project E3S Web of Conferences |
title | Research on Construction Practice of Assembled Substation——A Case in Anhui Xuancheng Xinhang 110kV Substation Project |
title_full | Research on Construction Practice of Assembled Substation——A Case in Anhui Xuancheng Xinhang 110kV Substation Project |
title_fullStr | Research on Construction Practice of Assembled Substation——A Case in Anhui Xuancheng Xinhang 110kV Substation Project |
title_full_unstemmed | Research on Construction Practice of Assembled Substation——A Case in Anhui Xuancheng Xinhang 110kV Substation Project |
title_short | Research on Construction Practice of Assembled Substation——A Case in Anhui Xuancheng Xinhang 110kV Substation Project |
title_sort | research on construction practice of assembled substation a case in anhui xuancheng xinhang 110kv substation project |
url | https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/62/e3sconf_icbte2019_02038.pdf |
work_keys_str_mv | AT ximingchen researchonconstructionpracticeofassembledsubstationacaseinanhuixuanchengxinhang110kvsubstationproject AT dianbao researchonconstructionpracticeofassembledsubstationacaseinanhuixuanchengxinhang110kvsubstationproject AT chaojunqian researchonconstructionpracticeofassembledsubstationacaseinanhuixuanchengxinhang110kvsubstationproject AT shaojiezhang researchonconstructionpracticeofassembledsubstationacaseinanhuixuanchengxinhang110kvsubstationproject |