Comparing three scheduling methods using BIM models in the Last Planner System
This article presents strategies for teaching scheduling methods such as takt-time, flowlines, and point-to-point precedence relations (PTPPRs) using building information modeling (BIM) models in the Last Planner System. This article is the extended version of the article entitled “Teaching Takt-Tim...
Main Authors: | Brioso Xavier, Murguia Danny, Urbina Alonso |
---|---|
Format: | Article |
Language: | English |
Published: |
Sciendo
2017-12-01
|
Series: | Organization, Technology and Management in Construction: An International Journal |
Subjects: | |
Online Access: | https://doi.org/10.1515/otmcj-2016-0024 |
Similar Items
-
The Last Planner System Style of Planning: Its Basis in Learning Theory
by: Bo Terje Kalsaas
Published: (2012-07-01) -
Applying Level of Detail in a BIM-Based Project: An Overall Process for Lean Design Management
by: Petteri Uusitalo, et al.
Published: (2019-05-01) -
Synergies between Last Planner System and OHSAS 18001 - A general overview = Sinergias entre el Last Planner System y la OHSAS 18001 - Una visión general
by: Xavier Brioso
Published: (2017-08-01) -
BIM-LEAN as a Methodology to Save Execution Costs in Building Construction—An Experience under the Spanish Framework
by: María Dolores Andújar-Montoya, et al.
Published: (2020-03-01) -
Teaching how to integrate Last Planner System and the Safety and Health Management System = Enseñando a integrar el Last Planner System y el Sistema de Gestión de Seguridad y Salud
by: Xavier Brioso, et al.
Published: (2018-04-01)