Key Technology and Difficult Proble Analysis of Karst Cave Treatment in Power Plant Project
[Introduction] The paper aims to sovle the sub-grade problems cause by complex karst and soil cave foundation, design problems in karst and soil cave foundation treatment design, construction problems often occurred in power plant projects, such as advanced drilling, bored pile and PHC pile construc...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Energy Observer Magazine Co., Ltd.
2022-05-01
|
Series: | 南方能源建设 |
Subjects: | |
Online Access: | https://www.energychina.press/en/article/doi/10.16516/j.gedi.issn2095-8676.2022.S1.011 |
_version_ | 1818543444488880128 |
---|---|
author | ZHOU Leijing YU Guozhao LIN Weibin |
author_facet | ZHOU Leijing YU Guozhao LIN Weibin |
author_sort | ZHOU Leijing |
collection | DOAJ |
description | [Introduction] The paper aims to sovle the sub-grade problems cause by complex karst and soil cave foundation, design problems in karst and soil cave foundation treatment design, construction problems often occurred in power plant projects, such as advanced drilling, bored pile and PHC pile construction difficult problems etc.. [Method] To describe the relevant karst and soil cave treatment key technologies, including treatment principles, treatment methods (including filling method, crossing method, pile foundation method), we analyzed and compared the relevant specifications, costs and practical engineering experience. [Results] The results we obtained is the solutions to the difficult problems in the treatment of karst and soil cavern foundation and the problems that are easy to occur in the punching construction of pile foundation of karst cavern foundation and the emergency response plan. [Conclusion] Finally, several treatment methods of karst foundation in power plant are suggesed, which can be used as reference for similar projects. |
first_indexed | 2024-12-11T22:35:28Z |
format | Article |
id | doaj.art-ac534e15f61947cdb82b19d6a79e8183 |
institution | Directory Open Access Journal |
issn | 2095-8676 |
language | English |
last_indexed | 2024-12-11T22:35:28Z |
publishDate | 2022-05-01 |
publisher | Energy Observer Magazine Co., Ltd. |
record_format | Article |
series | 南方能源建设 |
spelling | doaj.art-ac534e15f61947cdb82b19d6a79e81832022-12-22T00:47:59ZengEnergy Observer Magazine Co., Ltd.南方能源建设2095-86762022-05-019S1697510.16516/j.gedi.issn2095-8676.2022.S1.011Key Technology and Difficult Proble Analysis of Karst Cave Treatment in Power Plant ProjectZHOU Leijing0YU Guozhao1LIN Weibin2China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd., Guangzhou 510663, Guangdong, ChinaChina Resources Power (Yunfu) Co., Ltd., Yunfu 527322, Guangdong, ChinaChina Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd., Guangzhou 510663, Guangdong, China[Introduction] The paper aims to sovle the sub-grade problems cause by complex karst and soil cave foundation, design problems in karst and soil cave foundation treatment design, construction problems often occurred in power plant projects, such as advanced drilling, bored pile and PHC pile construction difficult problems etc.. [Method] To describe the relevant karst and soil cave treatment key technologies, including treatment principles, treatment methods (including filling method, crossing method, pile foundation method), we analyzed and compared the relevant specifications, costs and practical engineering experience. [Results] The results we obtained is the solutions to the difficult problems in the treatment of karst and soil cavern foundation and the problems that are easy to occur in the punching construction of pile foundation of karst cavern foundation and the emergency response plan. [Conclusion] Finally, several treatment methods of karst foundation in power plant are suggesed, which can be used as reference for similar projects.https://www.energychina.press/en/article/doi/10.16516/j.gedi.issn2095-8676.2022.S1.011power plantkarst cavesoil treatmentpile foundationpunching pile construction |
spellingShingle | ZHOU Leijing YU Guozhao LIN Weibin Key Technology and Difficult Proble Analysis of Karst Cave Treatment in Power Plant Project 南方能源建设 power plant karst cave soil treatment pile foundation punching pile construction |
title | Key Technology and Difficult Proble Analysis of Karst Cave Treatment in Power Plant Project |
title_full | Key Technology and Difficult Proble Analysis of Karst Cave Treatment in Power Plant Project |
title_fullStr | Key Technology and Difficult Proble Analysis of Karst Cave Treatment in Power Plant Project |
title_full_unstemmed | Key Technology and Difficult Proble Analysis of Karst Cave Treatment in Power Plant Project |
title_short | Key Technology and Difficult Proble Analysis of Karst Cave Treatment in Power Plant Project |
title_sort | key technology and difficult proble analysis of karst cave treatment in power plant project |
topic | power plant karst cave soil treatment pile foundation punching pile construction |
url | https://www.energychina.press/en/article/doi/10.16516/j.gedi.issn2095-8676.2022.S1.011 |
work_keys_str_mv | AT zhouleijing keytechnologyanddifficultprobleanalysisofkarstcavetreatmentinpowerplantproject AT yuguozhao keytechnologyanddifficultprobleanalysisofkarstcavetreatmentinpowerplantproject AT linweibin keytechnologyanddifficultprobleanalysisofkarstcavetreatmentinpowerplantproject |