Simulation-based Optimization Approached to Design a Proposed Warehouse Layout on Bicycle Industry
The finished goods must be stored in a warehouse before the items are dispatched. Due to the increasing demand in 2020, there will be an increase in the quantity of items, which will cause the finished goods warehouse at PT X to reach capacity. This issue lengthens the flow through the warehouse and...
Main Authors: | Farrel Stefan Sienera, Tanti Octavia, Desi Winoto |
---|---|
Format: | Article |
Language: | English |
Published: |
Petra Christian University
2022-11-01
|
Series: | Jurnal Teknik Industri |
Subjects: | |
Online Access: | https://jurnalindustri.petra.ac.id/index.php/ind/article/view/25206 |
Similar Items
-
Usulan Perbaikan Layout Area Gudang Kering Logistik Menggunakan Metode Dedicated Storage di PT. Starfood International
by: Muhammad Syaiful Anam, et al.
Published: (2023-09-01) -
Analisis Pengaturan Layout Gudang Sparepart Menggunakan Metode Dedicated Storage di Gudang Bengkel Yamaha Era Motor
by: Imelda Agustina, et al.
Published: (2021-06-01) -
Perencanaan Re-Layout Penempatan Barang Ownstok Dengan Menggunakan Metode Class Based Storage (CBS) di Warehouse PT. Pamapersada Nusantara Site BRCB (Binungan Blok 8)
by: Ramy Yahya, et al.
Published: (2023-06-01) -
Xylocoris flavipes predate stored grain pestsin simulation warehouse and evaluation of application effects
by: MEI Zhi-jian, et al.
Published: (2019-07-01) -
Warehouse operations planning and management/
by: 395849 Briggs, Andrew J.
Published: (1960)