OPTIMUM COMBINATION OF EXCAVATING MACHINERY USING ADVANCED PROGRAMMATIC RISK ENVIRONMENT AND MANAGEMENT MODEL
Since the proper use of construction machinery in infrastructure projects is so important, it is essential to employ an optimum machinery selection in these projects, because a s...
Main Authors: | M. Zeynalian, I. Kalantari Dehaghi |
---|---|
Format: | Article |
Language: | fas |
Published: |
Sharif University of Technology
2018-02-01
|
Series: | مهندسی عمران شریف |
Subjects: | |
Online Access: | https://sjce.journals.sharif.edu/article_1260_656b0f15f8d9a8aef0699aa5facc20cd.pdf |
Similar Items
-
OPTIMUM MIXED (MARITIME- AERIAL) ROUTE-PLANNING USING MINIMUM SPANNING TREE AND INTEGER PROGRAMMING
by: H. Moaddab, et al.
Published: (2020-11-01) -
DETERMINING CHARACTERISTICS OF OPTIMUM TUNED MASS DAMPER WITH COMBINING TRANSIENT AND STEADY STATE RESPONSES IN DAMPED VIBRATIONS
by: J. Alamatian, et al.
Published: (2017-08-01) -
INTEGRATION OF RISK MANAGEMENT AND FUZZY INFERENCE SYSTEMS IN ORDER TO PROJECT TIME ESTIMATION IN GAS REFINERIES CASE STUDY: CONSTRUCTION OF KHANGIRAN
by: A. Naderpour, et al.
Published: (2019-05-01) -
PERFORMANCE MEASUREMENT MODEL FOR ARCHITECTURAL CONSULTING ENGINEERING COMPANIES, USING THE BALANCED SCORE CARD (BSC)
by: A. Nazari, et al.
Published: (2015-11-01) -
EVALUATION OF ENDURANCE TIME METHOD IN SEISMIC ASSESSMENT OF LATERAL T-RESISTING FRAME SYSTEMS
by: M. Gorzin, et al.
Published: (2015-03-01)