Application of Fuzzy Sets to the Expert Estimation of Scrum-Based Projects
The paper is basically dedicated to the problem of effort estimation for the Product Backlog items of IT projects led accordingly to the Scrum framework. The effort estimation issue is important, because low quality estimation decreases the efficiency of project implementation. The paper proposes an...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2019-08-01
|
Series: | Symmetry |
Subjects: | |
Online Access: | https://www.mdpi.com/2073-8994/11/8/1032 |
_version_ | 1798040541252812800 |
---|---|
author | Paweł Rola Dorota Kuchta |
author_facet | Paweł Rola Dorota Kuchta |
author_sort | Paweł Rola |
collection | DOAJ |
description | The paper is basically dedicated to the problem of effort estimation for the Product Backlog items of IT projects led accordingly to the Scrum framework. The effort estimation issue is important, because low quality estimation decreases the efficiency of project implementation. The paper proposes an estimation method for the Product Backlog items of Scrum-based IT projects (which can be adapted also to other projects), which has two original elements with respect to the state of art in Scrum estimation: the usage of fuzzy numbers and strict rules for consensus forming, combined with a space for human interaction. The assumptions of the method should be complied with and were formulated on the basis of literature and authors experience. Two case studies were used for an initial method validation. The case studies confirmed a high potential of the method to increase estimation quality in Scrum-based projects, as well as in other project types. The case studies were conducted using research methods fulfilling the symmetry principle. The paper is thus an example of symmetry in management research. |
first_indexed | 2024-04-11T22:09:03Z |
format | Article |
id | doaj.art-acce6e2e4aeb484db2e8abcbda0b0d72 |
institution | Directory Open Access Journal |
issn | 2073-8994 |
language | English |
last_indexed | 2024-04-11T22:09:03Z |
publishDate | 2019-08-01 |
publisher | MDPI AG |
record_format | Article |
series | Symmetry |
spelling | doaj.art-acce6e2e4aeb484db2e8abcbda0b0d722022-12-22T04:00:37ZengMDPI AGSymmetry2073-89942019-08-01118103210.3390/sym11081032sym11081032Application of Fuzzy Sets to the Expert Estimation of Scrum-Based ProjectsPaweł Rola0Dorota Kuchta1Faculty of Computer Science and Management, Wrocław University of Science and Technology, ul. Ignacego Łukasiewicza 5, 50371 Wrocław, PolandFaculty of Computer Science and Management, Wrocław University of Science and Technology, ul. Ignacego Łukasiewicza 5, 50371 Wrocław, PolandThe paper is basically dedicated to the problem of effort estimation for the Product Backlog items of IT projects led accordingly to the Scrum framework. The effort estimation issue is important, because low quality estimation decreases the efficiency of project implementation. The paper proposes an estimation method for the Product Backlog items of Scrum-based IT projects (which can be adapted also to other projects), which has two original elements with respect to the state of art in Scrum estimation: the usage of fuzzy numbers and strict rules for consensus forming, combined with a space for human interaction. The assumptions of the method should be complied with and were formulated on the basis of literature and authors experience. Two case studies were used for an initial method validation. The case studies confirmed a high potential of the method to increase estimation quality in Scrum-based projects, as well as in other project types. The case studies were conducted using research methods fulfilling the symmetry principle. The paper is thus an example of symmetry in management research.https://www.mdpi.com/2073-8994/11/8/1032Scrumproduct backlogproject estimationfuzzy estimation |
spellingShingle | Paweł Rola Dorota Kuchta Application of Fuzzy Sets to the Expert Estimation of Scrum-Based Projects Symmetry Scrum product backlog project estimation fuzzy estimation |
title | Application of Fuzzy Sets to the Expert Estimation of Scrum-Based Projects |
title_full | Application of Fuzzy Sets to the Expert Estimation of Scrum-Based Projects |
title_fullStr | Application of Fuzzy Sets to the Expert Estimation of Scrum-Based Projects |
title_full_unstemmed | Application of Fuzzy Sets to the Expert Estimation of Scrum-Based Projects |
title_short | Application of Fuzzy Sets to the Expert Estimation of Scrum-Based Projects |
title_sort | application of fuzzy sets to the expert estimation of scrum based projects |
topic | Scrum product backlog project estimation fuzzy estimation |
url | https://www.mdpi.com/2073-8994/11/8/1032 |
work_keys_str_mv | AT pawełrola applicationoffuzzysetstotheexpertestimationofscrumbasedprojects AT dorotakuchta applicationoffuzzysetstotheexpertestimationofscrumbasedprojects |