ASSESSMENT OF THE POSSIBILITY TO RAISE THE LEVEL OF GROUNDWATER BELOW THE MALCZYCE BARRAGE
Exploitation of newly constructed Malczyce barrage will split the adjacent valley into two zones – above the barrage water will infiltrate from the river into the valley, however, below the dam, Odra will still draining river. Delivery of water from the upper level of the dam will help to improve wa...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | Polish |
Published: |
Polish Society of Ecological Engineering (PTIE)
2014-10-01
|
Series: | Inżynieria Ekologiczna |
Subjects: | |
Online Access: | http://www.journalssystem.com/ie/Ocena-mozliwosci-podniesienia-poziomu-wod-gruntowych-ponizej-stopnia-pietrzacego-malczyce,247,0,2.html |
_version_ | 1811316700021260288 |
---|---|
author | Wojciech Łyczko Mieczysław Chalfen Leszek Pływaczyk |
author_facet | Wojciech Łyczko Mieczysław Chalfen Leszek Pływaczyk |
author_sort | Wojciech Łyczko |
collection | DOAJ |
description | Exploitation of newly constructed Malczyce barrage will split the adjacent valley into two zones – above the barrage water will infiltrate from the river into the valley, however, below the dam, Odra will still draining river. Delivery of water from the upper level of the dam will help to improve water conditions of lands located below the damming. On the right bank, at the height of the step, built surge tank, from which water will be collected include forests for irrigation and to supply the upper section of the watercourse Młynna-Brzeźnica and areas used for agricultural purposes in the immediate vicinity of the watercourse. After the construction of Malczyce barrage Odra, in the zone located above the dam, will stay a drainage river. The water conditions of this area can be improved by supplying water from the compensation reservoir located on upper position of the dam. An influence of increasing of water level in Młynna-Brzeźnica river on groundwater level in adjacent areas was analyzed in the paper. Groundwater levels and their increasing with comparison to levels observed in September 2013 was calculated using a mathematical model. An effective range of influence of Młynna-Brzeźnica river for flow intensity 0,1 and 0,5 m3∙s‑1 was discussed. |
first_indexed | 2024-04-13T11:52:49Z |
format | Article |
id | doaj.art-acd56fd70feb4ad08f06b8162a80c69c |
institution | Directory Open Access Journal |
issn | 2081-139X 2392-0629 |
language | Polish |
last_indexed | 2024-04-13T11:52:49Z |
publishDate | 2014-10-01 |
publisher | Polish Society of Ecological Engineering (PTIE) |
record_format | Article |
series | Inżynieria Ekologiczna |
spelling | doaj.art-acd56fd70feb4ad08f06b8162a80c69c2022-12-22T02:47:59ZpolPolish Society of Ecological Engineering (PTIE)Inżynieria Ekologiczna2081-139X2392-06292014-10-01399510410.12912/2081139X.54247ASSESSMENT OF THE POSSIBILITY TO RAISE THE LEVEL OF GROUNDWATER BELOW THE MALCZYCE BARRAGEWojciech Łyczko0Mieczysław Chalfen1Leszek Pływaczyk2Instytut Kształtowania i Ochrony Środowiska, Uniwersytet Przyrodniczy we WrocławiuKatedra Matematyki, Uniwersytet Przyrodniczy we WrocławiuInstytut Kształtowania i Ochrony Środowiska, Uniwersytet Przyrodniczy we WrocławiuExploitation of newly constructed Malczyce barrage will split the adjacent valley into two zones – above the barrage water will infiltrate from the river into the valley, however, below the dam, Odra will still draining river. Delivery of water from the upper level of the dam will help to improve water conditions of lands located below the damming. On the right bank, at the height of the step, built surge tank, from which water will be collected include forests for irrigation and to supply the upper section of the watercourse Młynna-Brzeźnica and areas used for agricultural purposes in the immediate vicinity of the watercourse. After the construction of Malczyce barrage Odra, in the zone located above the dam, will stay a drainage river. The water conditions of this area can be improved by supplying water from the compensation reservoir located on upper position of the dam. An influence of increasing of water level in Młynna-Brzeźnica river on groundwater level in adjacent areas was analyzed in the paper. Groundwater levels and their increasing with comparison to levels observed in September 2013 was calculated using a mathematical model. An effective range of influence of Młynna-Brzeźnica river for flow intensity 0,1 and 0,5 m3∙s‑1 was discussed.http://www.journalssystem.com/ie/Ocena-mozliwosci-podniesienia-poziomu-wod-gruntowych-ponizej-stopnia-pietrzacego-malczyce,247,0,2.htmlgroundwatermathematical modeldamming up |
spellingShingle | Wojciech Łyczko Mieczysław Chalfen Leszek Pływaczyk ASSESSMENT OF THE POSSIBILITY TO RAISE THE LEVEL OF GROUNDWATER BELOW THE MALCZYCE BARRAGE Inżynieria Ekologiczna groundwater mathematical model damming up |
title | ASSESSMENT OF THE POSSIBILITY TO RAISE THE LEVEL OF GROUNDWATER BELOW THE MALCZYCE BARRAGE |
title_full | ASSESSMENT OF THE POSSIBILITY TO RAISE THE LEVEL OF GROUNDWATER BELOW THE MALCZYCE BARRAGE |
title_fullStr | ASSESSMENT OF THE POSSIBILITY TO RAISE THE LEVEL OF GROUNDWATER BELOW THE MALCZYCE BARRAGE |
title_full_unstemmed | ASSESSMENT OF THE POSSIBILITY TO RAISE THE LEVEL OF GROUNDWATER BELOW THE MALCZYCE BARRAGE |
title_short | ASSESSMENT OF THE POSSIBILITY TO RAISE THE LEVEL OF GROUNDWATER BELOW THE MALCZYCE BARRAGE |
title_sort | assessment of the possibility to raise the level of groundwater below the malczyce barrage |
topic | groundwater mathematical model damming up |
url | http://www.journalssystem.com/ie/Ocena-mozliwosci-podniesienia-poziomu-wod-gruntowych-ponizej-stopnia-pietrzacego-malczyce,247,0,2.html |
work_keys_str_mv | AT wojciechłyczko assessmentofthepossibilitytoraisethelevelofgroundwaterbelowthemalczycebarrage AT mieczysławchalfen assessmentofthepossibilitytoraisethelevelofgroundwaterbelowthemalczycebarrage AT leszekpływaczyk assessmentofthepossibilitytoraisethelevelofgroundwaterbelowthemalczycebarrage |