Study on industrial test of fully mechanized fast excavation technology of alternating with advancing or bolting
In view of problems of fast excavation and slow supporting in traditional roadway excavation technology, anchor drill rig was introduced in Tashan Coal Mine, fully mechanized fast excavation technology of alternating with advancing or bolting was developed, and industrial test of the technology was...
Main Authors: | , |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Department of Industry and Mine Automation
2016-09-01
|
Series: | Gong-kuang zidonghua |
Subjects: | |
Online Access: | http://www.gkzdh.cn/article/doi/10.13272/j.issn.1671-251x.2016.09.010 |
_version_ | 1797868865985708032 |
---|---|
author | WANG Chensheng SU Fang |
author_facet | WANG Chensheng SU Fang |
author_sort | WANG Chensheng |
collection | DOAJ |
description | In view of problems of fast excavation and slow supporting in traditional roadway excavation technology, anchor drill rig was introduced in Tashan Coal Mine, fully mechanized fast excavation technology of alternating with advancing or bolting was developed, and industrial test of the technology was studied. Through monitoring related parameters in technique implementation process, the following conclusions was obtained : convergence rate of around surrounding rock is less than 0.1 mm/d after roadway excavation support 60 d, explains that roadway convergence is stabile, the maximum rock bolt stress is 206 kN, anchor cable force is 305 kN, all are in the range of security. The conclusion shows that the technology can greatly improve anchoring force and control abscission layer. The technology achieves 10% attrition, improve 41% support efficiency and 33.3% drivage efficiency, which can be popularized and applied. |
first_indexed | 2024-04-10T00:02:34Z |
format | Article |
id | doaj.art-ad346167c9b04104abf49ff2b14ccc6e |
institution | Directory Open Access Journal |
issn | 1671-251X |
language | zho |
last_indexed | 2024-04-10T00:02:34Z |
publishDate | 2016-09-01 |
publisher | Editorial Department of Industry and Mine Automation |
record_format | Article |
series | Gong-kuang zidonghua |
spelling | doaj.art-ad346167c9b04104abf49ff2b14ccc6e2023-03-17T01:41:51ZzhoEditorial Department of Industry and Mine AutomationGong-kuang zidonghua1671-251X2016-09-01429434710.13272/j.issn.1671-251x.2016.09.010Study on industrial test of fully mechanized fast excavation technology of alternating with advancing or boltingWANG ChenshengSU FangIn view of problems of fast excavation and slow supporting in traditional roadway excavation technology, anchor drill rig was introduced in Tashan Coal Mine, fully mechanized fast excavation technology of alternating with advancing or bolting was developed, and industrial test of the technology was studied. Through monitoring related parameters in technique implementation process, the following conclusions was obtained : convergence rate of around surrounding rock is less than 0.1 mm/d after roadway excavation support 60 d, explains that roadway convergence is stabile, the maximum rock bolt stress is 206 kN, anchor cable force is 305 kN, all are in the range of security. The conclusion shows that the technology can greatly improve anchoring force and control abscission layer. The technology achieves 10% attrition, improve 41% support efficiency and 33.3% drivage efficiency, which can be popularized and applied.http://www.gkzdh.cn/article/doi/10.13272/j.issn.1671-251x.2016.09.010alternating with advancing or boltingfully mechanized fast excavation technologyanchor drill rigsupportmine pressure observatio |
spellingShingle | WANG Chensheng SU Fang Study on industrial test of fully mechanized fast excavation technology of alternating with advancing or bolting Gong-kuang zidonghua alternating with advancing or bolting fully mechanized fast excavation technology anchor drill rig support mine pressure observatio |
title | Study on industrial test of fully mechanized fast excavation technology of alternating with advancing or bolting |
title_full | Study on industrial test of fully mechanized fast excavation technology of alternating with advancing or bolting |
title_fullStr | Study on industrial test of fully mechanized fast excavation technology of alternating with advancing or bolting |
title_full_unstemmed | Study on industrial test of fully mechanized fast excavation technology of alternating with advancing or bolting |
title_short | Study on industrial test of fully mechanized fast excavation technology of alternating with advancing or bolting |
title_sort | study on industrial test of fully mechanized fast excavation technology of alternating with advancing or bolting |
topic | alternating with advancing or bolting fully mechanized fast excavation technology anchor drill rig support mine pressure observatio |
url | http://www.gkzdh.cn/article/doi/10.13272/j.issn.1671-251x.2016.09.010 |
work_keys_str_mv | AT wangchensheng studyonindustrialtestoffullymechanizedfastexcavationtechnologyofalternatingwithadvancingorbolting AT sufang studyonindustrialtestoffullymechanizedfastexcavationtechnologyofalternatingwithadvancingorbolting |