Design and application of mine integration dispatching communication system

In view of problem that most mine communication systems scattered, and could not cross the others for scheduling command, a mine integration dispatching communication system was designed, and composition and functions of the system were introduced. The practical application results show that the sys...

Full description

Bibliographic Details
Main Authors: XUE Xiaoyan, HUO Zhenlong, GU Jun
Format: Article
Language:zho
Published: Editorial Department of Industry and Mine Automation 2016-08-01
Series:Gong-kuang zidonghua
Subjects:
Online Access:http://www.gkzdh.cn/article/doi/10.13272/j.issn.1671-251x.2016.08.001
_version_ 1827988369135632384
author XUE Xiaoyan
HUO Zhenlong
GU Jun
author_facet XUE Xiaoyan
HUO Zhenlong
GU Jun
author_sort XUE Xiaoyan
collection DOAJ
description In view of problem that most mine communication systems scattered, and could not cross the others for scheduling command, a mine integration dispatching communication system was designed, and composition and functions of the system were introduced. The practical application results show that the system can be compatible with existing coal mine communication system, provide efficient business platform and bridge to leapfrog communication among each system, and effectively improve mine emergency scheduling disposal ability and management level of coal mine safety production.
first_indexed 2024-04-10T00:02:34Z
format Article
id doaj.art-ada81972922b41aaa6f62a69c353fbfc
institution Directory Open Access Journal
issn 1671-251X
language zho
last_indexed 2024-04-10T00:02:34Z
publishDate 2016-08-01
publisher Editorial Department of Industry and Mine Automation
record_format Article
series Gong-kuang zidonghua
spelling doaj.art-ada81972922b41aaa6f62a69c353fbfc2023-03-17T01:41:53ZzhoEditorial Department of Industry and Mine AutomationGong-kuang zidonghua1671-251X2016-08-014281510.13272/j.issn.1671-251x.2016.08.001Design and application of mine integration dispatching communication systemXUE XiaoyanHUO ZhenlongGU JunIn view of problem that most mine communication systems scattered, and could not cross the others for scheduling command, a mine integration dispatching communication system was designed, and composition and functions of the system were introduced. The practical application results show that the system can be compatible with existing coal mine communication system, provide efficient business platform and bridge to leapfrog communication among each system, and effectively improve mine emergency scheduling disposal ability and management level of coal mine safety production.http://www.gkzdh.cn/article/doi/10.13272/j.issn.1671-251x.2016.08.001mine communicationcommunication liaisonintegration dispatching communicationmobile dispatching communicatio
spellingShingle XUE Xiaoyan
HUO Zhenlong
GU Jun
Design and application of mine integration dispatching communication system
Gong-kuang zidonghua
mine communication
communication liaison
integration dispatching communication
mobile dispatching communicatio
title Design and application of mine integration dispatching communication system
title_full Design and application of mine integration dispatching communication system
title_fullStr Design and application of mine integration dispatching communication system
title_full_unstemmed Design and application of mine integration dispatching communication system
title_short Design and application of mine integration dispatching communication system
title_sort design and application of mine integration dispatching communication system
topic mine communication
communication liaison
integration dispatching communication
mobile dispatching communicatio
url http://www.gkzdh.cn/article/doi/10.13272/j.issn.1671-251x.2016.08.001
work_keys_str_mv AT xuexiaoyan designandapplicationofmineintegrationdispatchingcommunicationsystem
AT huozhenlong designandapplicationofmineintegrationdispatchingcommunicationsystem
AT gujun designandapplicationofmineintegrationdispatchingcommunicationsystem