Optimization of Pump Turbine Closing Operation to Minimize Water Hammer and Pulsating Pressures During Load Rejection

In load rejection transitional processes in pumped-storage plants (PSPs), the process of closing pump turbines, including guide vane (GVCS) and ball valve closing schemes (BVCS), is crucial for controlling pulsating pressures and water hammer. Extreme pressures generated during the load rejection pr...

詳細記述

書誌詳細
主要な著者: Jiawei Ye, Wei Zeng, Zhigao Zhao, Jiebin Yang, Jiandong Yang
フォーマット: 論文
言語:English
出版事項: MDPI AG 2020-02-01
シリーズ:Energies
主題:
オンライン・アクセス:https://www.mdpi.com/1996-1073/13/4/1000