Total heavy prefabrication: Santo António dos Cavaleiros (SAC) and Quinta do Morgado (QM)
Prefabrication is one of the two great methods of industrialized construction that became cost-effective after World War II. The development of such industrialized building techniques was prompted by the great shortage of buildings resulting from the massive destruction of cities, the big demographi...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
DINÂMIA’CET – IUL, Centre for Socioeconomic and Territorial Studies
2022-04-01
|
Series: | Cidades, Comunidades e Território |
Subjects: | |
Online Access: | http://journals.openedition.org/cidades/5354 |