IMPROVEMENT OF BOARDWALK NAILED – SPAN BRIDGE STRUCTURES

The article is devoted to the implementation in practice of the construction of the new bridge boardwalk timber - nail span structures that meet the modern requirements of load capacity, reliability and durability. The authors propose and describe a new design of the span timber-beam-peg–nailed bloc...

Full description

Bibliographic Details
Main Authors: V. A. Utkin, P. N. Kobzev
Format: Article
Language:Russian
Published: Siberian State Automobile and Highway University 2017-08-01
Series:Вестник СибАДИ
Subjects:
Online Access:https://vestnik.sibadi.org/jour/article/view/82
Description
Summary:The article is devoted to the implementation in practice of the construction of the new bridge boardwalk timber - nail span structures that meet the modern requirements of load capacity, reliability and durability. The authors propose and describe a new design of the span timber-beam-peg–nailed blocks with longitudinal-transverse orientation of the belt boards and carrying transverse reinforced concrete slab of the carriageway. The represented materials show the effectiveness of the proposed solutions.
ISSN:2071-7296
2658-5626