Risk Factors That Lead to Time and Cost Overruns of Building Projects in Saudi Arabia
Rapid transformation across all sectors through Saudi Arabia’s vision 2030 initiatives led to an increase in construction activities. However, the construction industry has been already facing huge cost and time overruns, affecting all stakeholders. The aim of this study is to identify and explore t...
Main Authors: | Saad Alshihri, Khalid Al-Gahtani, Abdulmohsen Almohsen |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2022-06-01
|
Series: | Buildings |
Subjects: | |
Online Access: | https://www.mdpi.com/2075-5309/12/7/902 |
Similar Items
-
Causes of Time and Cost Overrun: A Case Study of Health Sector Projects in Peshawar, KP
by: Shahnawaz Khan, et al.
Published: (2019-12-01) -
CAUSES OF DELAY AND COST OVERRUN FOR EDUCATIONAL BUILDING PROJECTS IN EGYPT
by: Mohamed Gebrel, et al.
Published: (2021-09-01) -
Financial Mismanagement: A Leading Cause of Time and Cost Overrun in Mega Construction Projects in Pakistan
by: F. A. Shaikh
Published: (2020-02-01) -
Modeling the Causes and Mitigation Measures for Cost Overruns in Building Construction: The Case of Higher Education Projects
by: Yasir Alhammadi, et al.
Published: (2024-02-01) -
Factors Leading to Cost Overrun Occurrence in Construction Projects
by: Mostafa El-Ahwal, et al.
Published: (2016-03-01)