Perencanaan Line Balaning Guna Meningkatkan Output Produksi

Every companyw ill alwaysh avem aing oal in a maximumb ennefit.F or this, onef actor which support his is how to makea good productionp rocessT. his will be reachedif balancing line of productionfl oor hasa verages tressingo f work especiallyfo r assemblyc ompanyb ecause material handling in a w...

Full description

Bibliographic Details
Main Author: Teguh Baroto
Format: Article
Language:English
Published: Jurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah Malang 2010-04-01
Series:Jurnal Teknik Industri
Subjects:
Online Access:http://ejournal.umm.ac.id/index.php/industri/article/view/190
_version_ 1818212594768412672
author Teguh Baroto
author_facet Teguh Baroto
author_sort Teguh Baroto
collection DOAJ
description Every companyw ill alwaysh avem aing oal in a maximumb ennefit.F or this, onef actor which support his is how to makea good productionp rocessT. his will be reachedif balancing line of productionfl oor hasa verages tressingo f work especiallyfo r assemblyc ompanyb ecause material handling in a work station will influence alother work station and cause production target of companyw on't be available. For getting line balancing use Rank Positional Weighat (RPW), method which is a heuristicm ethodst hat is statemenot f trial and error approachingT.h is methodd ependso n the function value for each work operation based on the standard time for each work activities followingt hep roductionp rocessra nking( presedencdeia gram). From the analysis using RPW method can be found optimum balance delay to each type of ARM producti s from 60,46% to 20,5488% with productiono utputl lom 113,50u nits/day become 116 unit/day, and also work efiiciency from 60,50 yo to 78,4511 o%, with workstation numbera bout7 work stationsI.n otherh andf or type ofBED product1 5 hasb alanced elayf rom 35,29o /oto 16,454w ith productiono utputi ncreaseft om 77,44m t/day become1 20u niVdaya nd also hase fficiencya bout6 4,710 /ob ecome8 3,548% with work stationn umbera bout6 . Theni t can be concludedt hat work stationd esignu sing RPW methodw ill increaseo utput produot especiallfyo r assemblyc ompany.
first_indexed 2024-12-12T05:50:53Z
format Article
id doaj.art-b233660c01b24d4487d8f28f6151fbe1
institution Directory Open Access Journal
issn 1978-1431
2527-4112
language English
last_indexed 2024-12-12T05:50:53Z
publishDate 2010-04-01
publisher Jurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah Malang
record_format Article
series Jurnal Teknik Industri
spelling doaj.art-b233660c01b24d4487d8f28f6151fbe12022-12-22T00:35:41ZengJurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah MalangJurnal Teknik Industri1978-14312527-41122010-04-012210911710.22219/JTIUMM.Vol2.No2.109-117188Perencanaan Line Balaning Guna Meningkatkan Output ProduksiTeguh BarotoEvery companyw ill alwaysh avem aing oal in a maximumb ennefit.F or this, onef actor which support his is how to makea good productionp rocessT. his will be reachedif balancing line of productionfl oor hasa verages tressingo f work especiallyfo r assemblyc ompanyb ecause material handling in a work station will influence alother work station and cause production target of companyw on't be available. For getting line balancing use Rank Positional Weighat (RPW), method which is a heuristicm ethodst hat is statemenot f trial and error approachingT.h is methodd ependso n the function value for each work operation based on the standard time for each work activities followingt hep roductionp rocessra nking( presedencdeia gram). From the analysis using RPW method can be found optimum balance delay to each type of ARM producti s from 60,46% to 20,5488% with productiono utputl lom 113,50u nits/day become 116 unit/day, and also work efiiciency from 60,50 yo to 78,4511 o%, with workstation numbera bout7 work stationsI.n otherh andf or type ofBED product1 5 hasb alanced elayf rom 35,29o /oto 16,454w ith productiono utputi ncreaseft om 77,44m t/day become1 20u niVdaya nd also hase fficiencya bout6 4,710 /ob ecome8 3,548% with work stationn umbera bout6 . Theni t can be concludedt hat work stationd esignu sing RPW methodw ill increaseo utput produot especiallfyo r assemblyc ompany.http://ejournal.umm.ac.id/index.php/industri/article/view/190Line BalancingRPWPrecedence Diagram
spellingShingle Teguh Baroto
Perencanaan Line Balaning Guna Meningkatkan Output Produksi
Jurnal Teknik Industri
Line Balancing
RPW
Precedence Diagram
title Perencanaan Line Balaning Guna Meningkatkan Output Produksi
title_full Perencanaan Line Balaning Guna Meningkatkan Output Produksi
title_fullStr Perencanaan Line Balaning Guna Meningkatkan Output Produksi
title_full_unstemmed Perencanaan Line Balaning Guna Meningkatkan Output Produksi
title_short Perencanaan Line Balaning Guna Meningkatkan Output Produksi
title_sort perencanaan line balaning guna meningkatkan output produksi
topic Line Balancing
RPW
Precedence Diagram
url http://ejournal.umm.ac.id/index.php/industri/article/view/190
work_keys_str_mv AT teguhbaroto perencanaanlinebalaninggunameningkatkanoutputproduksi