Risks of Design Stage in Iraqi Construction Project

The management of construction projects needs to complete the basics of system management and work. Starting from the idea and how to turn it into a full study and ended at the construction project completion arriving at the purpose prepared for it, so the projects need to control on its operation a...

Full description

Bibliographic Details
Main Authors: Alaa Kharbat Shadhar, Buroog Basheer Mahmood
Format: Article
Language:English
Published: University of Baghdad 2018-03-01
Series:Journal of Engineering
Online Access:https://www.jcoeng.edu.iq/index.php/main/article/view/549/459
_version_ 1797757133367803904
author Alaa Kharbat Shadhar
Buroog Basheer Mahmood
author_facet Alaa Kharbat Shadhar
Buroog Basheer Mahmood
author_sort Alaa Kharbat Shadhar
collection DOAJ
description The management of construction projects needs to complete the basics of system management and work. Starting from the idea and how to turn it into a full study and ended at the construction project completion arriving at the purpose prepared for it, so the projects need to control on its operation and integration system in order to succeed. It is no secret for who concerned in construction projects field that the design stage is a very important stage in construction project because it determines the final features of the project through the requirements provided by the employer for the consultant to formulate it during this phase in the form of plans, drawings, and specifications, then translated on the ground as the shape of completed project meets those requirements Therefore it has been necessary to focus in this paper on the design stage also demonstrated and analysis the most important risk facing this stage and their impact on a construction project by introducing a questionnaire to identify the most important risks factors at this stage affecting on the project. The paper had been shown that the effect of the design stage on Lump sum type of project contract was higher than the unit price, while the most important factor effect on a project its fast response of design team to prepare the design documents in order to facilitate the workflow and sequence of execution with effect level 3.714.
first_indexed 2024-03-12T18:10:36Z
format Article
id doaj.art-b28d29a445864c3483f29c9dbe472c2e
institution Directory Open Access Journal
issn 1726-4073
2520-3339
language English
last_indexed 2024-03-12T18:10:36Z
publishDate 2018-03-01
publisher University of Baghdad
record_format Article
series Journal of Engineering
spelling doaj.art-b28d29a445864c3483f29c9dbe472c2e2023-08-02T09:15:47ZengUniversity of BaghdadJournal of Engineering1726-40732520-33392018-03-01243114121Risks of Design Stage in Iraqi Construction ProjectAlaa Kharbat ShadharBuroog Basheer MahmoodThe management of construction projects needs to complete the basics of system management and work. Starting from the idea and how to turn it into a full study and ended at the construction project completion arriving at the purpose prepared for it, so the projects need to control on its operation and integration system in order to succeed. It is no secret for who concerned in construction projects field that the design stage is a very important stage in construction project because it determines the final features of the project through the requirements provided by the employer for the consultant to formulate it during this phase in the form of plans, drawings, and specifications, then translated on the ground as the shape of completed project meets those requirements Therefore it has been necessary to focus in this paper on the design stage also demonstrated and analysis the most important risk facing this stage and their impact on a construction project by introducing a questionnaire to identify the most important risks factors at this stage affecting on the project. The paper had been shown that the effect of the design stage on Lump sum type of project contract was higher than the unit price, while the most important factor effect on a project its fast response of design team to prepare the design documents in order to facilitate the workflow and sequence of execution with effect level 3.714.https://www.jcoeng.edu.iq/index.php/main/article/view/549/459
spellingShingle Alaa Kharbat Shadhar
Buroog Basheer Mahmood
Risks of Design Stage in Iraqi Construction Project
Journal of Engineering
title Risks of Design Stage in Iraqi Construction Project
title_full Risks of Design Stage in Iraqi Construction Project
title_fullStr Risks of Design Stage in Iraqi Construction Project
title_full_unstemmed Risks of Design Stage in Iraqi Construction Project
title_short Risks of Design Stage in Iraqi Construction Project
title_sort risks of design stage in iraqi construction project
url https://www.jcoeng.edu.iq/index.php/main/article/view/549/459
work_keys_str_mv AT alaakharbatshadhar risksofdesignstageiniraqiconstructionproject
AT buroogbasheermahmood risksofdesignstageiniraqiconstructionproject