A SVM-based implicit stochastic joint scheduling method for ‘wind-photovoltaic-cascaded hydropower stations’ systems
With the gradual expansion of the development scale of wind power and photovoltaic (PV) power plants, the multi-energy complementary power generation system, typically represented by hydro-PV/hydro-wind/hydro-wind-PV, has become an important part of modern power systems. Aiming at the joint operatio...
Main Authors: | Jidong Li, Guangjie Luo, Wenbin Hu, Shijun Chen, Xing Liu, Lu Gao |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2022-11-01
|
Series: | Energy Reports |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2352484722022107 |
Similar Items
-
Impact on traditional hydropower under a multi-energy complementary operation scheme: An illustrative case of a ‘wind–photovoltaic–cascaded hydropower plants’ system
by: Jidong Li, et al.
Published: (2023-09-01) -
Enhanced bi-layer scheduling strategies for the cascade hydropower-photovoltaic complementary system using a novel meta-heuristic algorithm
by: Li Shen, et al.
Published: (2024-01-01) -
Review on the Method of Compensation Benefit Allocation for Cascade Hydropower Stations
by: LI Yinghai, et al.
Published: (2020-01-01) -
Optimal operation of cascade hydropower station based on interior point method
by: Shuai Feng, et al.
Published: (2022-08-01) -
Short-Term Optimal Scheduling Method of Cascade Hydropower Stations Based on Segmented Load Construction Strategy
by: LI Chonghao, et al.
Published: (2023-01-01)