Analisis Perhitungan Jembatan Gelagar I pada Jembatan Jalan Raya dan Jembatan Kereta Api

The bridge is a means of connecting roads which is disconnected by barriers of the river, valley, sea, road or railway. Classified by functionality, bridges can be divided into highway bridge and railroad bridge. This study discusses whether the use of I-girder with 210 m height can be used on highw...

Full description

Bibliographic Details
Main Author: Irpan Hidayat
Format: Article
Language:English
Published: Bina Nusantara University 2013-06-01
Series:ComTech
Subjects:
Online Access:https://journal.binus.ac.id/index.php/comtech/article/view/2797
_version_ 1797709567157600256
author Irpan Hidayat
author_facet Irpan Hidayat
author_sort Irpan Hidayat
collection DOAJ
description The bridge is a means of connecting roads which is disconnected by barriers of the river, valley, sea, road or railway. Classified by functionality, bridges can be divided into highway bridge and railroad bridge. This study discusses whether the use of I-girder with 210 m height can be used on highway bridges and railway bridges. A comparison is done on the analysis of bridge structure calculation of 50 m spans and loads used in both the function of the bridge. For highway bridge, loads are grouped into three, which are self weight girder, additional dead load and live load. The additional dead loads for highway bridge are plate, deck slab, asphalt, and the diaphragm, while for the live load is load D which consists of a Uniform Distributed Load (UDL) and Knife Edge Load (KEL) based on "Pembebanan Untuk Jembatan RSNI T-02-2005". The load grouping for railway bridge equals to highway bridge. The analysis on the railway bridges does not use asphalt, and is replaced with a load of ballast on the track and the additional dead load. Live load on the structure of the railway bridge is the load based on Rencana Muatan 1921 (RM.1921). From the calculation of the I-girder bridge spans 50 m and girder height 210 cm for railway bridge, the stress on the lower beam is over the limit stress allowed. These results identified that the I-girder height 210 cm at the railway bridge has not been able to resist the loads on the railway bridge.
first_indexed 2024-03-12T06:39:26Z
format Article
id doaj.art-b2fb072767d241159ccadbc4dd07c1a8
institution Directory Open Access Journal
issn 2087-1244
2476-907X
language English
last_indexed 2024-03-12T06:39:26Z
publishDate 2013-06-01
publisher Bina Nusantara University
record_format Article
series ComTech
spelling doaj.art-b2fb072767d241159ccadbc4dd07c1a82023-09-03T01:09:13ZengBina Nusantara UniversityComTech2087-12442476-907X2013-06-014151752810.21512/comtech.v4i1.27972188Analisis Perhitungan Jembatan Gelagar I pada Jembatan Jalan Raya dan Jembatan Kereta ApiIrpan Hidayat0Bina Nusantara UniversityThe bridge is a means of connecting roads which is disconnected by barriers of the river, valley, sea, road or railway. Classified by functionality, bridges can be divided into highway bridge and railroad bridge. This study discusses whether the use of I-girder with 210 m height can be used on highway bridges and railway bridges. A comparison is done on the analysis of bridge structure calculation of 50 m spans and loads used in both the function of the bridge. For highway bridge, loads are grouped into three, which are self weight girder, additional dead load and live load. The additional dead loads for highway bridge are plate, deck slab, asphalt, and the diaphragm, while for the live load is load D which consists of a Uniform Distributed Load (UDL) and Knife Edge Load (KEL) based on "Pembebanan Untuk Jembatan RSNI T-02-2005". The load grouping for railway bridge equals to highway bridge. The analysis on the railway bridges does not use asphalt, and is replaced with a load of ballast on the track and the additional dead load. Live load on the structure of the railway bridge is the load based on Rencana Muatan 1921 (RM.1921). From the calculation of the I-girder bridge spans 50 m and girder height 210 cm for railway bridge, the stress on the lower beam is over the limit stress allowed. These results identified that the I-girder height 210 cm at the railway bridge has not been able to resist the loads on the railway bridge.https://journal.binus.ac.id/index.php/comtech/article/view/2797bridges, roads, railways, load
spellingShingle Irpan Hidayat
Analisis Perhitungan Jembatan Gelagar I pada Jembatan Jalan Raya dan Jembatan Kereta Api
ComTech
bridges, roads, railways, load
title Analisis Perhitungan Jembatan Gelagar I pada Jembatan Jalan Raya dan Jembatan Kereta Api
title_full Analisis Perhitungan Jembatan Gelagar I pada Jembatan Jalan Raya dan Jembatan Kereta Api
title_fullStr Analisis Perhitungan Jembatan Gelagar I pada Jembatan Jalan Raya dan Jembatan Kereta Api
title_full_unstemmed Analisis Perhitungan Jembatan Gelagar I pada Jembatan Jalan Raya dan Jembatan Kereta Api
title_short Analisis Perhitungan Jembatan Gelagar I pada Jembatan Jalan Raya dan Jembatan Kereta Api
title_sort analisis perhitungan jembatan gelagar i pada jembatan jalan raya dan jembatan kereta api
topic bridges, roads, railways, load
url https://journal.binus.ac.id/index.php/comtech/article/view/2797
work_keys_str_mv AT irpanhidayat analisisperhitunganjembatangelagaripadajembatanjalanrayadanjembatankeretaapi