Analisis Perhitungan Jembatan Gelagar I pada Jembatan Jalan Raya dan Jembatan Kereta Api
The bridge is a means of connecting roads which is disconnected by barriers of the river, valley, sea, road or railway. Classified by functionality, bridges can be divided into highway bridge and railroad bridge. This study discusses whether the use of I-girder with 210 m height can be used on highw...
Main Author: | Irpan Hidayat |
---|---|
Format: | Article |
Language: | English |
Published: |
Bina Nusantara University
2013-06-01
|
Series: | ComTech |
Subjects: | |
Online Access: | https://journal.binus.ac.id/index.php/comtech/article/view/2797 |
Similar Items
-
Desain Struktur Jembatan Kereta Api Tipe Concrete Through Arch: Studi Kasus Jembatan Kereta Api BH 1828 Purworejo
by: Algazt Aryad Masagala
Published: (2022-05-01) -
EVALUASI KELAYAKAN STRUKTUR JEMBATAN GELAGAR KOMPOSIT BENTANG 40 M BERDASARKAN NILAI SISA KAPASITAS JEMBATAN Studi Kasus Jembatan Kuranji, Provinsi Sumatera Barat
by: , AZWAR ANAS, et al.
Published: (2013) -
ANALISIS BIAYA SIKLUS HIDUP JEMBATAN GELAGAR
BETON BERTULANG KONVENSIONAL DAN JEMBATAN
INTEGRAL PENUH BETON BERTULANG BENTANG 20
METER
by: , GINA RIZKA AMALIA, et al.
Published: (2014) -
Modifikasi Jembatan Sembayat Baru II Menggunakan Sistem Jembatan Busur Rangka Baja
by: Rio Prasmoro, et al.
Published: (2017-03-01) -
DAMPAK KEBERADAAN JEMBATAN SURAMADU TERHADAP NILAI TANAH DI WILAYAH KAKI JEMBATAN SISI MADURA
by: Amanatuz Zuhriyah, et al.
Published: (2013-11-01)