Investigation on the Settlement of High Rockfill Embankment Using Centrifuge Tests
To study the deformation behavior of the high rockfill (HRF) embankment during construction and operation, based on more than a 50-m high rockfill embankment of the second-class road reconstruction project from Xunyang to Ankang of the national road 316 in Shaanxi, China, the centrifuge model test w...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Frontiers Media S.A.
2021-08-01
|
Series: | Frontiers in Physics |
Subjects: | |
Online Access: | https://www.frontiersin.org/articles/10.3389/fphy.2021.547991/full |
_version_ | 1819152882566430720 |
---|---|
author | Hong Jun Jing Ming Jie Gou Yan Qing Zhang Ki-IL Song |
author_facet | Hong Jun Jing Ming Jie Gou Yan Qing Zhang Ki-IL Song |
author_sort | Hong Jun Jing |
collection | DOAJ |
description | To study the deformation behavior of the high rockfill (HRF) embankment during construction and operation, based on more than a 50-m high rockfill embankment of the second-class road reconstruction project from Xunyang to Ankang of the national road 316 in Shaanxi, China, the centrifuge model test was performed to study the deformation laws of HRF embankment. The test results showed the following: (i) the HRF embankment was stable during construction and operation; (ii) during construction, the settlement occurred at the embankment top, and uplift occurred at the slope foot. Moreover, the deformation at the top was greater than that at the slope foot, and the deformations at both the top and the slope toe reached the maximum value at the end of construction; (iii) during operation, the settlement at the embankment top continued, and it changed rapidly at the start of operation. And then, the rate of the settlement slowed down and reached a steady state finally. The deformation of the slope foot was very small. This study can provide basis and reference for the design and construction of a similar project in mountain areas. |
first_indexed | 2024-12-22T14:56:21Z |
format | Article |
id | doaj.art-b3311e44295e41f7a50a68937dadbf03 |
institution | Directory Open Access Journal |
issn | 2296-424X |
language | English |
last_indexed | 2024-12-22T14:56:21Z |
publishDate | 2021-08-01 |
publisher | Frontiers Media S.A. |
record_format | Article |
series | Frontiers in Physics |
spelling | doaj.art-b3311e44295e41f7a50a68937dadbf032022-12-21T18:22:13ZengFrontiers Media S.A.Frontiers in Physics2296-424X2021-08-01910.3389/fphy.2021.547991547991Investigation on the Settlement of High Rockfill Embankment Using Centrifuge TestsHong Jun Jing0Ming Jie Gou1Yan Qing Zhang2Ki-IL Song3School of Architecture and Civil Engineering, Xi’an University of Science and Technology, Xi’an, ChinaSchool of Architecture and Civil Engineering, Xi’an University of Science and Technology, Xi’an, ChinaSchool of Architecture and Civil Engineering, Xi’an University of Science and Technology, Xi’an, ChinaDepartment of Civil Engineering, Inha University, Incheon, KoreaTo study the deformation behavior of the high rockfill (HRF) embankment during construction and operation, based on more than a 50-m high rockfill embankment of the second-class road reconstruction project from Xunyang to Ankang of the national road 316 in Shaanxi, China, the centrifuge model test was performed to study the deformation laws of HRF embankment. The test results showed the following: (i) the HRF embankment was stable during construction and operation; (ii) during construction, the settlement occurred at the embankment top, and uplift occurred at the slope foot. Moreover, the deformation at the top was greater than that at the slope foot, and the deformations at both the top and the slope toe reached the maximum value at the end of construction; (iii) during operation, the settlement at the embankment top continued, and it changed rapidly at the start of operation. And then, the rate of the settlement slowed down and reached a steady state finally. The deformation of the slope foot was very small. This study can provide basis and reference for the design and construction of a similar project in mountain areas.https://www.frontiersin.org/articles/10.3389/fphy.2021.547991/fullroad engineeringhigh rockfill embankmentcentrifuge testssettlementlong term deformation |
spellingShingle | Hong Jun Jing Ming Jie Gou Yan Qing Zhang Ki-IL Song Investigation on the Settlement of High Rockfill Embankment Using Centrifuge Tests Frontiers in Physics road engineering high rockfill embankment centrifuge tests settlement long term deformation |
title | Investigation on the Settlement of High Rockfill Embankment Using Centrifuge Tests |
title_full | Investigation on the Settlement of High Rockfill Embankment Using Centrifuge Tests |
title_fullStr | Investigation on the Settlement of High Rockfill Embankment Using Centrifuge Tests |
title_full_unstemmed | Investigation on the Settlement of High Rockfill Embankment Using Centrifuge Tests |
title_short | Investigation on the Settlement of High Rockfill Embankment Using Centrifuge Tests |
title_sort | investigation on the settlement of high rockfill embankment using centrifuge tests |
topic | road engineering high rockfill embankment centrifuge tests settlement long term deformation |
url | https://www.frontiersin.org/articles/10.3389/fphy.2021.547991/full |
work_keys_str_mv | AT hongjunjing investigationonthesettlementofhighrockfillembankmentusingcentrifugetests AT mingjiegou investigationonthesettlementofhighrockfillembankmentusingcentrifugetests AT yanqingzhang investigationonthesettlementofhighrockfillembankmentusingcentrifugetests AT kiilsong investigationonthesettlementofhighrockfillembankmentusingcentrifugetests |