Strategi Pengembangan Bank Sampah Sahdu Skala Kelurahan di Desa Tanimulya Kabupaten Bandung Barat

Out of four waste banks in the Tanimulya Village, Sahdu Waste Bank is the only proper waste bank in operation. Based on the 2019 West Bandung District’s Environmental Agency (Dinas Lingkungan Hidup Kebersihan) Strategic Plan, which stated the target in 2022, that it needs to reduce 10%, from the cu...

Full description

Bibliographic Details
Main Authors: Yulianti Pratama, Muhammad Rizki Kurniawan
Format: Article
Language:English
Published: University of Serambi Mekkah 2022-02-01
Series:Jurnal Serambi Engineering
Subjects:
Online Access:https://ojs.serambimekkah.ac.id/jse/article/view/3829
_version_ 1811207494610976768
author Yulianti Pratama
Muhammad Rizki Kurniawan
author_facet Yulianti Pratama
Muhammad Rizki Kurniawan
author_sort Yulianti Pratama
collection DOAJ
description Out of four waste banks in the Tanimulya Village, Sahdu Waste Bank is the only proper waste bank in operation. Based on the 2019 West Bandung District’s Environmental Agency (Dinas Lingkungan Hidup Kebersihan) Strategic Plan, which stated the target in 2022, that it needs to reduce 10%, from the current 8% reduction of the waste generation through the solid waste management and waste bank facilites, prior to the landfill. One of the efforts that can be done is through the development of the Sahdu Waste Bank from the hamlet scale to the urban village scale by using the Waste Bank Indexing Method. Assessing the existing condition with the waste bank index, identification and compiling the recommendation towards parameters that need improvement. Based on the results of the assessment, a score of 53.2 (out of 100, and is considered as fairly good category), reveals 14 sub indicator that can be improved, which consist of 6 Sub Indicator of Management System, 6 Sub Indicator of Operational System, and 2 Sub Indicator of Waste Bank Facility. The value of the Sahdu Waste Bank can be increased to 88.3 (out of 100, and is considered as very good), which generates the reduction of 266.67% of waste, equal to 4 ton/month from 150 kg/month. That would make Sahdu Waste Bank contributes 1.6% from the reduction target of 10% for the West Bandung District waste.
first_indexed 2024-04-12T04:05:28Z
format Article
id doaj.art-b370e769051d4c84afee7594d44f076d
institution Directory Open Access Journal
issn 2528-3561
2541-1934
language English
last_indexed 2024-04-12T04:05:28Z
publishDate 2022-02-01
publisher University of Serambi Mekkah
record_format Article
series Jurnal Serambi Engineering
spelling doaj.art-b370e769051d4c84afee7594d44f076d2022-12-22T03:48:37ZengUniversity of Serambi MekkahJurnal Serambi Engineering2528-35612541-19342022-02-017110.32672/jse.v7i1.38293010Strategi Pengembangan Bank Sampah Sahdu Skala Kelurahan di Desa Tanimulya Kabupaten Bandung BaratYulianti PratamaMuhammad Rizki KurniawanOut of four waste banks in the Tanimulya Village, Sahdu Waste Bank is the only proper waste bank in operation. Based on the 2019 West Bandung District’s Environmental Agency (Dinas Lingkungan Hidup Kebersihan) Strategic Plan, which stated the target in 2022, that it needs to reduce 10%, from the current 8% reduction of the waste generation through the solid waste management and waste bank facilites, prior to the landfill. One of the efforts that can be done is through the development of the Sahdu Waste Bank from the hamlet scale to the urban village scale by using the Waste Bank Indexing Method. Assessing the existing condition with the waste bank index, identification and compiling the recommendation towards parameters that need improvement. Based on the results of the assessment, a score of 53.2 (out of 100, and is considered as fairly good category), reveals 14 sub indicator that can be improved, which consist of 6 Sub Indicator of Management System, 6 Sub Indicator of Operational System, and 2 Sub Indicator of Waste Bank Facility. The value of the Sahdu Waste Bank can be increased to 88.3 (out of 100, and is considered as very good), which generates the reduction of 266.67% of waste, equal to 4 ton/month from 150 kg/month. That would make Sahdu Waste Bank contributes 1.6% from the reduction target of 10% for the West Bandung District waste.https://ojs.serambimekkah.ac.id/jse/article/view/3829waste bank, development, strategy, waste bank indexing method, reduction
spellingShingle Yulianti Pratama
Muhammad Rizki Kurniawan
Strategi Pengembangan Bank Sampah Sahdu Skala Kelurahan di Desa Tanimulya Kabupaten Bandung Barat
Jurnal Serambi Engineering
waste bank, development, strategy, waste bank indexing method, reduction
title Strategi Pengembangan Bank Sampah Sahdu Skala Kelurahan di Desa Tanimulya Kabupaten Bandung Barat
title_full Strategi Pengembangan Bank Sampah Sahdu Skala Kelurahan di Desa Tanimulya Kabupaten Bandung Barat
title_fullStr Strategi Pengembangan Bank Sampah Sahdu Skala Kelurahan di Desa Tanimulya Kabupaten Bandung Barat
title_full_unstemmed Strategi Pengembangan Bank Sampah Sahdu Skala Kelurahan di Desa Tanimulya Kabupaten Bandung Barat
title_short Strategi Pengembangan Bank Sampah Sahdu Skala Kelurahan di Desa Tanimulya Kabupaten Bandung Barat
title_sort strategi pengembangan bank sampah sahdu skala kelurahan di desa tanimulya kabupaten bandung barat
topic waste bank, development, strategy, waste bank indexing method, reduction
url https://ojs.serambimekkah.ac.id/jse/article/view/3829
work_keys_str_mv AT yuliantipratama strategipengembanganbanksampahsahduskalakelurahandidesatanimulyakabupatenbandungbarat
AT muhammadrizkikurniawan strategipengembanganbanksampahsahduskalakelurahandidesatanimulyakabupatenbandungbarat