Reliability and Maintenance Prioritization Analysis of Combined Cooling, Heating and Power Systems
A combined cooling, heating, and power (CCHP) system is a complex and repairable system containing a large number of components and series of subsystems. When a failure occurs in one component, it might cause a failure of a subsystem or whole system. Traditional maintenance methods might lead to the...
Main Authors: | Jinming Jiang, Xindong Wei, Weijun Gao, Soichiro Kuroki, Zhonghui Liu |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2018-06-01
|
Series: | Energies |
Subjects: | |
Online Access: | http://www.mdpi.com/1996-1073/11/6/1519 |
Similar Items
-
A budget allocation and programming-based RCM approach to improve the reliability of power distribution networks
by: Farshid Keynia, et al.
Published: (2022-11-01) -
Optimization of Reliability Centered Maintenance Bassed on Maintenance Costs and Reliability with Consideration of Location of Components
by: Mahdi Karbasian, et al.
Published: (2011-03-01) -
Deciding a Multicriteria Decision-Making (MCDM) Method to Prioritize Maintenance Work Orders of Hydroelectric Power Plants
by: Renan Favarão da Silva, et al.
Published: (2021-12-01) -
Plant maintenance and reliability engineering /
by: Raju, N. V. S.
Published: (2011) -
Optimal Design of a Combined Cooling, Heating, and Power System and Its Ability to Adapt to Uncertainty
by: Tao Zhang, et al.
Published: (2020-07-01)