Robust optimization of a discrete time-cost-environment trade-off problem by considering uncertainty in time and cost
One of the major issues in construction project management is selection of the best alternative for execution of each activity, so that the project progresses with the lowest possible total cost and total time. In the real world, different sources of uncertainty usually adversely affect on activity...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | fas |
Published: |
Semnan University
2019-09-01
|
Series: | مجله مدل سازی در مهندسی |
Subjects: | |
Online Access: | https://modelling.semnan.ac.ir/article_4013_9af018d4408ad963b4cd6627ab5f716e.pdf |
_version_ | 1797296552949055488 |
---|---|
author | Elahe Heydarnezhad salmasnia salmasnia Reza Baradaran Kazemzadeh |
author_facet | Elahe Heydarnezhad salmasnia salmasnia Reza Baradaran Kazemzadeh |
author_sort | Elahe Heydarnezhad |
collection | DOAJ |
description | One of the major issues in construction project management is selection of the best alternative for execution of each activity, so that the project progresses with the lowest possible total cost and total time. In the real world, different sources of uncertainty usually adversely affect on activity duration and activity cost. Therefore, it is important to present methods for robust construction project scheduling that are less sensitive to disruptions caused by noise factors. In addition, existing approaches in literature seldom focus on environmentally conscious construction planning. However, obtaining of this aim requires to consider multiple objectives and their relationships, simultaneously. In this study, a roust optimization based method for solving discrete time-cost-enviroment trade-off problem is presented, in which time and cost of activities as uncertain factors are considered. To investigate the performance of the suggested approach, a computational analysis on construction project of protective wall of the east coast of port in the economic zone of Amirabad is performed. the obtained results indicate that the robust model has beter performance in comparison with the corresponding deterministic model. |
first_indexed | 2024-03-07T22:06:25Z |
format | Article |
id | doaj.art-b390b0b55ef74b1ebbe5449b681ce312 |
institution | Directory Open Access Journal |
issn | 2008-4854 2783-2538 |
language | fas |
last_indexed | 2024-03-07T22:06:25Z |
publishDate | 2019-09-01 |
publisher | Semnan University |
record_format | Article |
series | مجله مدل سازی در مهندسی |
spelling | doaj.art-b390b0b55ef74b1ebbe5449b681ce3122024-02-23T19:06:23ZfasSemnan Universityمجله مدل سازی در مهندسی2008-48542783-25382019-09-01175821523210.22075/jme.2019.11855.11464013Robust optimization of a discrete time-cost-environment trade-off problem by considering uncertainty in time and costElahe Heydarnezhad0salmasnia salmasnia1Reza Baradaran Kazemzadeh2Faculty of Industrial Engineering, Tarbiat Modares UniversityQom universityFaculty of Industrial Engineering, Tarbiat Modares universityOne of the major issues in construction project management is selection of the best alternative for execution of each activity, so that the project progresses with the lowest possible total cost and total time. In the real world, different sources of uncertainty usually adversely affect on activity duration and activity cost. Therefore, it is important to present methods for robust construction project scheduling that are less sensitive to disruptions caused by noise factors. In addition, existing approaches in literature seldom focus on environmentally conscious construction planning. However, obtaining of this aim requires to consider multiple objectives and their relationships, simultaneously. In this study, a roust optimization based method for solving discrete time-cost-enviroment trade-off problem is presented, in which time and cost of activities as uncertain factors are considered. To investigate the performance of the suggested approach, a computational analysis on construction project of protective wall of the east coast of port in the economic zone of Amirabad is performed. the obtained results indicate that the robust model has beter performance in comparison with the corresponding deterministic model.https://modelling.semnan.ac.ir/article_4013_9af018d4408ad963b4cd6627ab5f716e.pdfproject managementtime-cost-enviroment trade-offrobust optimizationmulti-objective optimization |
spellingShingle | Elahe Heydarnezhad salmasnia salmasnia Reza Baradaran Kazemzadeh Robust optimization of a discrete time-cost-environment trade-off problem by considering uncertainty in time and cost مجله مدل سازی در مهندسی project management time-cost-enviroment trade-off robust optimization multi-objective optimization |
title | Robust optimization of a discrete time-cost-environment trade-off problem by considering uncertainty in time and cost |
title_full | Robust optimization of a discrete time-cost-environment trade-off problem by considering uncertainty in time and cost |
title_fullStr | Robust optimization of a discrete time-cost-environment trade-off problem by considering uncertainty in time and cost |
title_full_unstemmed | Robust optimization of a discrete time-cost-environment trade-off problem by considering uncertainty in time and cost |
title_short | Robust optimization of a discrete time-cost-environment trade-off problem by considering uncertainty in time and cost |
title_sort | robust optimization of a discrete time cost environment trade off problem by considering uncertainty in time and cost |
topic | project management time-cost-enviroment trade-off robust optimization multi-objective optimization |
url | https://modelling.semnan.ac.ir/article_4013_9af018d4408ad963b4cd6627ab5f716e.pdf |
work_keys_str_mv | AT elaheheydarnezhad robustoptimizationofadiscretetimecostenvironmenttradeoffproblembyconsideringuncertaintyintimeandcost AT salmasniasalmasnia robustoptimizationofadiscretetimecostenvironmenttradeoffproblembyconsideringuncertaintyintimeandcost AT rezabaradarankazemzadeh robustoptimizationofadiscretetimecostenvironmenttradeoffproblembyconsideringuncertaintyintimeandcost |