Tunnelling with Full-Face Shielded Machines: A 3D Numerical Analysis of an Earth Pressure Balance (EPB) Excavation Sequence Using the Finite Element Method (FEM)
Urban tunnelling can be highly challenging, especially in areas where limited ground settlements and environmental disturbance is required. Mechanised tunnelling is usually preferred in such ground environments, specifically Slurry or EPBM (Earth Pressure Balance Machine), depending on the ground pr...
Main Authors: | Jonathan Tyrer, Chrysothemis Paraskevopoulou, Ravi Shah, Richard Miller, Michael Kavvadas |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2023-08-01
|
Series: | Geosciences |
Subjects: | |
Online Access: | https://www.mdpi.com/2076-3263/13/8/244 |
Similar Items
-
Research on Prediction of EPB Shield Tunneling Parameters Based on LGBM
by: Wei Wang, et al.
Published: (2024-03-01) -
Characterization of Underlying Twin Shield Tunnels Due to Foundation-Excavation Unloading in Soft Soils: An Experimental and Numerical Study
by: Xiaodong Cheng, et al.
Published: (2021-11-01) -
A Comparison of Two Methods Modeling High-Temperature Fatigue Crack Initiation in Ferrite–Pearlite Steel
by: Zheng Fang, et al.
Published: (2022-05-01) -
Synchronous shield tunnelling technology combining advancement and segment fabrication: Principle, verification and application
by: Yeting Zhu, et al.
Published: (2023-12-01) -
Mechanised shield tunnelling /
by: Maidl, Bernhard
Published: (c201)