Design, testing, commissioning, and early operation of the third-generation n_TOF neutron spallation target at CERN

The n_TOF facility at the European Laboratory for Particle Physics (CERN) is a top-class, high-brightness neutron spallation source dedicated to high-resolution neutron time-of-flight experiments. During CERN’s Long Shutdown 2 (LS2, 2019-2021), the facility’s neutron spallation target was upgraded a...

Full description

Bibliographic Details
Main Authors: Esposito Raffaele, Calviani Marco, Aberle Oliver
Format: Article
Language:English
Published: EDP Sciences 2023-01-01
Series:EPJ Web of Conferences
Online Access:https://www.epj-conferences.org/articles/epjconf/pdf/2023/11/epjconf_intds2023_07003.pdf
_version_ 1827896774378913792
author Esposito Raffaele
Calviani Marco
Aberle Oliver
author_facet Esposito Raffaele
Calviani Marco
Aberle Oliver
author_sort Esposito Raffaele
collection DOAJ
description The n_TOF facility at the European Laboratory for Particle Physics (CERN) is a top-class, high-brightness neutron spallation source dedicated to high-resolution neutron time-of-flight experiments. During CERN’s Long Shutdown 2 (LS2, 2019-2021), the facility’s neutron spallation target was upgraded and is now operating with its third-generation target. The target is based on a pure-Pb core cooled by gaseous nitrogen and has been designed to withstand the impact of a 20-GeV/c proton beam in bunches of 1013 protons with a bunch duration of 6-8 ns RMS. The produced neutrons span 11 orders of magnitude in kinetic energy (from thermal to GeV) and are delivered to two experimental areas and a neutron irradiation station near the target. This contribution includes a description of the physics and engineering design processes that brought the facility from its second-generation target to its current third-generation target, the planned autopsy of the second-generation target in 2023 to investigate its status after 10 years of operation, tests under beam irradiation carried out on target prototypes at CERN’s HiRadMat facility, and the commissioning with beam of the new target, as well as the challenges encountered during the first year of its operation.
first_indexed 2024-03-12T22:40:36Z
format Article
id doaj.art-b47e00e7f51043709de88bd0c58fe3f6
institution Directory Open Access Journal
issn 2100-014X
language English
last_indexed 2024-03-12T22:40:36Z
publishDate 2023-01-01
publisher EDP Sciences
record_format Article
series EPJ Web of Conferences
spelling doaj.art-b47e00e7f51043709de88bd0c58fe3f62023-07-21T09:41:24ZengEDP SciencesEPJ Web of Conferences2100-014X2023-01-012850700310.1051/epjconf/202328507003epjconf_intds2023_07003Design, testing, commissioning, and early operation of the third-generation n_TOF neutron spallation target at CERNEsposito Raffaele0Calviani Marco1Aberle Oliver2European Laboratory for Particle Physics (CERN)European Laboratory for Particle Physics (CERN)European Laboratory for Particle Physics (CERN)The n_TOF facility at the European Laboratory for Particle Physics (CERN) is a top-class, high-brightness neutron spallation source dedicated to high-resolution neutron time-of-flight experiments. During CERN’s Long Shutdown 2 (LS2, 2019-2021), the facility’s neutron spallation target was upgraded and is now operating with its third-generation target. The target is based on a pure-Pb core cooled by gaseous nitrogen and has been designed to withstand the impact of a 20-GeV/c proton beam in bunches of 1013 protons with a bunch duration of 6-8 ns RMS. The produced neutrons span 11 orders of magnitude in kinetic energy (from thermal to GeV) and are delivered to two experimental areas and a neutron irradiation station near the target. This contribution includes a description of the physics and engineering design processes that brought the facility from its second-generation target to its current third-generation target, the planned autopsy of the second-generation target in 2023 to investigate its status after 10 years of operation, tests under beam irradiation carried out on target prototypes at CERN’s HiRadMat facility, and the commissioning with beam of the new target, as well as the challenges encountered during the first year of its operation.https://www.epj-conferences.org/articles/epjconf/pdf/2023/11/epjconf_intds2023_07003.pdf
spellingShingle Esposito Raffaele
Calviani Marco
Aberle Oliver
Design, testing, commissioning, and early operation of the third-generation n_TOF neutron spallation target at CERN
EPJ Web of Conferences
title Design, testing, commissioning, and early operation of the third-generation n_TOF neutron spallation target at CERN
title_full Design, testing, commissioning, and early operation of the third-generation n_TOF neutron spallation target at CERN
title_fullStr Design, testing, commissioning, and early operation of the third-generation n_TOF neutron spallation target at CERN
title_full_unstemmed Design, testing, commissioning, and early operation of the third-generation n_TOF neutron spallation target at CERN
title_short Design, testing, commissioning, and early operation of the third-generation n_TOF neutron spallation target at CERN
title_sort design testing commissioning and early operation of the third generation n tof neutron spallation target at cern
url https://www.epj-conferences.org/articles/epjconf/pdf/2023/11/epjconf_intds2023_07003.pdf
work_keys_str_mv AT espositoraffaele designtestingcommissioningandearlyoperationofthethirdgenerationntofneutronspallationtargetatcern
AT calvianimarco designtestingcommissioningandearlyoperationofthethirdgenerationntofneutronspallationtargetatcern
AT aberleoliver designtestingcommissioningandearlyoperationofthethirdgenerationntofneutronspallationtargetatcern