Critical drawdown pressure prediction for sanding production of underground gas storage in a depleted reservoir in China
Abstract Sanding production of the underground gas storage (UGS) in the depleted reservoir will cause the decline of effective storage capacity, and the erosion of well string and auxiliary equipment, and other engineering problems. A deep understanding of the sanding production contributes to maint...
Main Authors: | Rui Song, Ruiyang Xie, Ping Zhang, Guihong Pei, Jianjun Liu, Xusheng Wan |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2023-11-01
|
Series: | Energy Science & Engineering |
Subjects: | |
Online Access: | https://doi.org/10.1002/ese3.1582 |
Similar Items
-
Study on Critical Drawdown Pressure of Sanding for Wellbore of Underground Gas Storage in a Depleted Gas Reservoir
by: Rui Song, et al.
Published: (2022-08-01) -
Underground Gas Storage Process Optimisation with Respect to Reservoir Parameters and Production Equipment
by: Vladislav Brkić, et al.
Published: (2021-07-01) -
Experimental study on sand production of depleted oil and gas reservoirs
by: Yuda Zhang, et al.
Published: (2023-02-01) -
Technical Challenges of Safety Emergency Drawdown for High Dam and Large Reservoir Project
by: Xueyu Zheng, et al.
Published: (2023-04-01) -
Predicting the critical drawdown pressure of sanding onset for perforated wells in ultra‐deep reservoirs with high temperature and high pressure
by: Yu Lu, et al.
Published: (2021-09-01)