Performance Analyses of 15 kW Grid-Tied Photo Voltaic Solar System Type under Baghdad city climate
The performance analyses of 15 kWp (kW peak) Grid -Tied solar PV system (that considered first of its type) implemented at the Training and Energy Research Center Subsidiary of Iraqi Ministry of Electricity in Baghdad city has been achieved. The system consists of 72 modules arranged in 6 strings we...
Main Authors: | Nibras Mahmood Obaid, Emad T. Hashim, Naseer K. Kasim |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Baghdad
2020-03-01
|
Series: | Journal of Engineering |
Subjects: | |
Online Access: | http://joe.uobaghdad.edu.iq/index.php/main/article/view/834 |
Similar Items
-
Power Quality Examination for (250KW) PV Grid-tied Connected at Various Irradiance Levels
by: Ahmed Jasim, et al.
Published: (2022-08-01) -
Analysis of solar photo‐voltaic for grid integration viability in Uganda
by: Chrish Kavuma, et al.
Published: (2022-03-01) -
Performansi Grid Tie Inverter dengan Variasi Pembebanan pada PV-on Grid Module Trainer
by: YULI ASMI RAHMAN, et al.
Published: (2022-04-01) -
Energy Storage Sizing Strategy for Grid-Tied PV Plants under Power Clipping Limitations
by: Nicolás Müller, et al.
Published: (2019-05-01) -
Assessing the Techno-Economic Impact of Derating Factors on Optimally Tilted Grid-Tied Photovoltaic Systems
by: Hasan Masrur, et al.
Published: (2021-02-01)