MECHANISM OF CUTOFF WALL ON SHALLOW TUNNEL IN LIQUEFIED SOIL
Gradual increments of excess pore pressure in saturated soil layers during earthquakes lead to a decrease in effective stress and soil liquefaction. The damage caused by soil liq...
Main Authors: | T. Doosti, A. Golshani |
---|---|
Format: | Article |
Language: | fas |
Published: |
Sharif University of Technology
2015-08-01
|
Series: | مهندسی عمران شریف |
Subjects: | |
Online Access: | https://sjce.journals.sharif.edu/article_962_1550c1f41bcd1a2d45706f77648de19e.pdf |
Similar Items
-
INVESTIGATION ON THE EFFECTS OF FOUNDATION STIFFNESS ON SURFACE FAULT RUPTURE IN REVERSE DIP-SLIP FAULTS
by: M. Tehranizadeh, et al.
Published: (2017-08-01) -
THE THICKNESS EFFECT OF CONNECTION PLATE OF BEAM TO STEEL FILLED COLUMN WITH CONCRETE ON SEISMIC BEHAVIOR OF THE CONNECTION
by: S.H. H.Lavassani, et al.
Published: (2019-02-01) -
PREDICTION OF SURFACE SETTLEMENT AND INNER FORCES OF LINING OF HORSESHOE-SHAPED TUNNELS BY USING ARTIFICIAL NEURAL NETWORKS
by: M.R. Alamdar, et al.
Published: (2019-05-01) -
EFFECT OF UNDERGROUND STRUCTURE LINING FLEXIBILITY ON ACCELERATION RESPONSE AT GROUND SURFACE
by: M.H. Baziar, et al.
Published: (2016-02-01) -
INVESTIGATION INTO THE EFFECT OF INNER STEEL TUBE- CONCRETE COMPOSITE ACTION ON THE FIRE RESISTANCE OF CFDST COLUMNS
by: B. Shekastehband, et al.
Published: (2018-05-01)